The page lists 7 deliverables related to the research project "ECOBULK".
title and desprition | type | last update |
---|---|---|
Project Website operativeWebsite platform. This deliverable will include the webpage structure and how the internal and external servers are set as well as how the information is shown Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Websites, patent fillings, videos etc. | 2020-02-19 |
Report on Baseline descriptionDescription of current design considerations, materials choices, value chain, employment, cooperation and information exchange obtained in Task 2.1. The report will include the principles of the baseline of social, environmental and economic indicators which are identified (MS2); the information to be delivered to T2.3 for comparison against material/manufacturing technology selection for circularity; the information to be delivered to T2.4 as a baseline (benchmark) against circular design concepts; the information to support data requirements for database in WP6, WP7 (LCA). Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Documents, reports | 2020-02-19 |
Project videoAudio-visual material of the ECOBULK project. Target audience will be defined during the project execution. First video at M18 and final video at M42. Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Websites, patent fillings, videos etc. | 2020-02-19 |
Solutions for the final sorting of Bulky WasteDescription of the technologies utilised for the wooden, fibre and plastic fraction of the municipal bulky waste. Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Documents, reports | 2020-02-19 |
Project newsletter(First version at M6, update each 6 months). It collects all the news related to the ECOBULK project (including but not limited to the project progress and updates) and the potential events and other synergies within the project’s scope. Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Websites, patent fillings, videos etc. | 2020-02-19 |
Report on the standardisation landscape and applicable standardsReport the results of the subtask 8.7.1. it will gather an analysis of the current standards and the applicable standards and the necessary bodies to be involved in the ECOBULK project to be applicable. It will contain an analysis identifying the existing and under-development standard documents relevant for the project. The level of relevance and the status will be highlighted. The areas to be covered will be iteratively set according to the interests of the consortium (normally the core activities). The report will also include the key information about standardization technical committees responsible for such projects. According to the above objective of this D 8.5 it will serve as input material for those WP and Tasks related to the areas covered, that’s why it will be delivered at the beginning of the project. Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Documents, reports | 2020-02-19 |
Review of material and manufacturing process selection criteria.Development of material/process selection for modularity, durability, remanufacturing and recycling. The deliverable is based on the work undertaken in T2.3 (data/information collection) and it will include: the information about the materials to select for circular products (MS3); the information to be delivered to T2.4 for design of modular products and the inputs to T4.1, T4.2, T5.2 and T5.3; the supporting of the collection of information for database in WP6. Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 |
Documents, reports | 2020-02-19 |