Opendata, web and dolomites

NARSIS project deliverables

The page lists 14 deliverables related to the research project "NARSIS".

 List of Deliverables

NARSIS: list of downloadable deliverables.
title and desprition type last update

Development of single and secondary effect hazard assessment methodologies including uncertainty quantification and comparison

This deliverable will provide methods to analyse extreme hazards using multi-varied statistics and to account for secondary hazards associated with each NPP component separately using physical approaches. On the other hand, it will present a stochastic approach to scenario development, allowing characterization of the hazard curve to integrate all possible uncertainty, temporal and spatial combinations for Design Basis Events (see task 1.3 for details).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Definition of hazard-induced damage states and development of state-specific APETs for demonstration purposes

This deliverable will provide a map of the key decisions identified in task 5.2, to be made during the implementation of EOP/EDMG/SAMG in response to the considered hazard damage state into the logic of corresponding state-specific APET, developed based on the experience and knowledge from the Level-2 PSA studies (cf. task 5.3).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Project Newsletter (e-mailing) - M18

Project Newsletter (e-mailing) - M18

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Websites, patent fillings, videos etc. 2020-04-09

Project Newsletter (e-mailing) - M12

Project Newsletter (e-mailing) - M12

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Websites, patent fillings, videos etc. 2020-04-09

Risk integration methods for high risk industries

This deliverable will present a review and comparison of risk integration methods from high risk industries (e.g. aviation, chemical and nuclear industries), with particular emphasis on methods able to incorporate low probability events, multi-hazards, and integration of human, social/organizational and technical aspects (cf. task 3.1).
It will also review the deterministic & probabilistic methods for identification of latent weaknesses in complex industrial facilities. Hence, this deliverable merges the contents of former deliverables D3.1 (due on M12) and D3.6 (initially due on M18, but now suppressed).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Methods to incorporate human factors within a multi-hazard approach

This deliverable will present the method developed to enable integration of human aspects into fragility functions and to investigate their impact on them (cf. task 2.4).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Methodology to derive vector-based fragility functions I: theoretical aspects

This deliverable will present the general methodology proposed in task 2.3, to design and check elaborate fragility models with respect to multiple intensity measures (i.e. vector-valued), thus harmonizing the response of the NPP SSC to multi-hazard solicitations.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Review of state-of-the art for hazard and multi-hazard characterisation

This deliverable will present the extensive review of existing multi-hazard approaches and procedures for natural hazard assessment with respect to nuclear hazard and safety, as proposed in task1.1.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Communication and Dissemination Plan report

Communication and Dissemination Plan report of the project.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Project presentation brochure

The project brochure will present the main information on the NARSIS project: aims and main expected outcomes, consortium, ...

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-04-09

Project website (activation)

This deliverable is directly linked to task 6.1. The website will serve for public dissemination of project information and deliverables, as well as for the team working area and exchanges.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Websites, patent fillings, videos etc. 2020-04-09

Project Newsletter (e-mailing) - M6

The NARSIS Newsletter will be produced every six months, starting on Month 6.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Websites, patent fillings, videos etc. 2020-04-09

Use of E-BEPU for evaluation of Defence-in-Depth

This deliverable will present the systematic application of E-BEPU methodology for Defence-in-Depth implementation (results from sub-task 3.4.2).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Documents, reports 2020-02-12

Education and training materials

Education & Training materials will be ready on Month 24, as lectures will be taught at Master level, between Month 24 and Month 48.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-1

download deliverable 

Other 2020-02-12