Opendata, web and dolomites

Content4All project deliverables

The page lists 8 deliverables related to the research project "Content4All".

 List of Deliverables

Content4All: list of downloadable deliverables.
title and desprition type last update

Pilot 1 demonstrator architecture, integration plan, and evaluation methodologies

A plan for executing the T5.5 Pilot 1 large scale demonstration of the remote sign-interpretation scenario will be presented, including a full description of the system architecture, integration plan and trials to be carried out. Evaluation methodologies and metrics will also be included, along with a rationale for choosing those methodologies.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Documents, reports 2020-02-14

Project Web-site

An interactive website will be established (www.content4all.com). The website (including FTP services for consortium members) will describe the aims of the project, describe the partners, and will list the publications and standards contributions. It will also allow public deliverables to be downloaded. Links to social networking will also be included in the website. A secure area will be set up for confidential documentation for consortium members. This website will be disseminated in all major events to provide a unified view of the project (T6.2).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-14

Bi-annual project newsletters

Bi-annual project newsletters will provide an insight to the project activities. The newsletter will be created as a multi-media document, including promotional materials which will be created for different audiences - technical audiences and the general public. The latter can be reached through CONTENT4ALL related information in TV programmes, e.g. BBC Click in the UK. The Newsletter will also provide “position statements” from experts in different disciplines related to CONTENT4ALL (T6.2).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-14

Initial requirements and specifications for pilot demonstrators

This report will mainly specify the application requirements, development environments and specifications for the application that will be used for the demonstration scenarios. Key scenarios identified will be included with use cases and evaluation tools for the application. High level object oriented design diagrams along with actors and entities involved will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Documents, reports 2020-02-14

Data Management Plan

This document will form the basis for collecting, managing and curating the data generated in CONTENT4ALL to be released as open research data in D5.7. The data management plan will specifically outline how the data is to be used and the legal aspects of sharing, exploiting and commericalizing products based on the shared information.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Documents, reports 2020-02-14

Initial reference system architecture

An initial architecture will be proposed, including detailed block diagrams, interface descriptions, operating scenarios, and functionality. The proposed architecture will provide a framework to carry out tasks in remaining work packages. Key technologies to be developed will be highlighted and a high level design approach/success measures will be described.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Documents, reports 2020-02-14

Initial Report on 3D model capture and rendering

This deliverable will provide information and a description of the WP3 achievements on a yearly basis. It will describe the novel hybrid human body model representation, algorithms for tracking, warping and rendering as well as output samples and evaluation results

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Documents, reports 2020-02-14

Project Leaflet

A leaflet will be produced to publicise the key objectives of the project and will be circulated in all major related events/conferences/forums etc. The leaflet will be maintained as a “live” document throughout the whole project, and updated based on project achievements (T6.2).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2017

download deliverable 

Other 2020-02-14