Opendata, web and dolomites

ECO-DRILLING SIGNED

Environmentally efficient full profile drilling solution

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ECO-DRILLING project word cloud

Explore the words cloud of the ECO-DRILLING project. It provides you a very rough idea of what is the project "ECO-DRILLING" about.

temporary    upwards    life    accumulated    wp3    co2    cut    wp1    settings    economic    service    roads    difference    commercialise    traction    distances    positions    closure    disruptive    plants    trl9    mountain    locations    prototyping    42    optimise    operations    reduce    61    prototype    annual    string    37    market    directional    trl    full    rotatory    accumulate    1km    piloting    138    altitude    drilling    boost    functionalities    hydropower    roi    solution    piloted    global    estimate    least    significantly    generate    subsystems    0m    readiness    eco    trl8    emissions    performance    5m    environmental    860    environmentally    trl7    maturation    validation    profits    elevating    successfully    company    proyections    time    unfeasible    pilot    final    commercialisation    revenues    building    sales    drill    length    2km    subset    wp2    profile    50    heads    integrate    vision    13    sme    eliminating    benefits   

Project "ECO-DRILLING" data sheet

The following table provides information about the project.

Coordinator
NORHARD AS 

Organization address
address: FINSAVEIEN 9
city: TONSTAD
postcode: 4440
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website https://norhard.no/horisont-2020-2
 Total cost 2˙811˙875 €
 EC max contribution 1˙968˙312 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-09-01   to  2020-02-29

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NORHARD AS NO (TONSTAD) coordinator 1˙968˙312.00

Map

 Project objective

The overall vision of the ECO-DRILLING project is to prototype, pilot, and commercialise our cost-effective and environmentally friendly full profile directional drilling technology for the global hydropower sector. ECO-DRILLING is the only solution capable of drilling upwards over long distances and high heads (up to 2km drilling length-1km altitude difference) using a non-rotatory drill string. Our disruptive technology has the potential to cut annual CO2 emissions with 13,860 tonnes in 5 years according to our sales proyections, reduce the environmental impact of drilling operations (e.g. by eliminating the need for building temporary access roads to the mountain top), and drilling costs by 50%. ECO-DRILLING will support the development of hydropower plants at locations currently unfeasible due to technical or environmental challenges. We have defined a subset of specific objectives covering final prototyping, validation, and commercialisation readiness activities. Achieving them will bring us to a wide market uptake. 1) Technology maturation objectives (WP1) to optimise the functionalities of ECO-DRILLING’s subsystems and integrate them into the final prototype to be piloted in real-life settings, raising ECO-DRILLING TRL from TRL7 to TRL8. 2) Piloting and validation objectives (WP2) to demonstrate ECO-DRILLING’s technical and economic performance, functionality, and user benefits through a large-scale piloting in real-life operating settings, elevating eco-drilling from TRL8 to TRL9. 3) Commercialisation readiness objectives (WP3-6) enabling us to successfully bring the ECO-DRILLING service to the market and reach sales traction beyond Phase 2. Through the ECO-DRILLING SME Phase 2 project we will significantly boost the growth in our company. We estimate that by year 5 after project closure, we will reach accumulated revenues of €138.0m, generate at least 37 new full-time positions, and accumulate profits of €61.5m, with 6.42 ROI.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ECO-DRILLING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ECO-DRILLING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

SEGE (2017)

Small Efficient Gas Engine

Read More  

FlyInGS (2017)

Flywheel energy storage for Increased Grid Stability

Read More