Opendata, web and dolomites

ECO-DRILLING SIGNED

Environmentally efficient full profile drilling solution

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ECO-DRILLING project word cloud

Explore the words cloud of the ECO-DRILLING project. It provides you a very rough idea of what is the project "ECO-DRILLING" about.

13    unfeasible    proyections    co2    drill    drilling    annual    upwards    plants    generate    life    vision    cut    accumulate    building    environmentally    sme    disruptive    significantly    market    emissions    subsystems    prototype    wp2    environmental    validation    roi    pilot    directional    time    roads    50    maturation    estimate    settings    difference    revenues    traction    wp1    wp3    860    commercialisation    altitude    138    final    economic    heads    1km    solution    boost    61    string    subset    service    eco    optimise    full    distances    global    sales    least    reduce    functionalities    accumulated    eliminating    mountain    temporary    trl    profile    elevating    trl7    37    2km    commercialise    readiness    hydropower    0m    42    performance    operations    closure    company    length    5m    benefits    trl8    positions    locations    prototyping    trl9    piloted    successfully    piloting    rotatory    integrate    profits   

Project "ECO-DRILLING" data sheet

The following table provides information about the project.

Coordinator
NORHARD AS 

Organization address
address: FINSAVEIEN 9
city: TONSTAD
postcode: 4440
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website https://norhard.no/horisont-2020-2
 Total cost 2˙811˙875 €
 EC max contribution 1˙968˙312 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-09-01   to  2020-02-29

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NORHARD AS NO (TONSTAD) coordinator 1˙968˙312.00

Map

 Project objective

The overall vision of the ECO-DRILLING project is to prototype, pilot, and commercialise our cost-effective and environmentally friendly full profile directional drilling technology for the global hydropower sector. ECO-DRILLING is the only solution capable of drilling upwards over long distances and high heads (up to 2km drilling length-1km altitude difference) using a non-rotatory drill string. Our disruptive technology has the potential to cut annual CO2 emissions with 13,860 tonnes in 5 years according to our sales proyections, reduce the environmental impact of drilling operations (e.g. by eliminating the need for building temporary access roads to the mountain top), and drilling costs by 50%. ECO-DRILLING will support the development of hydropower plants at locations currently unfeasible due to technical or environmental challenges. We have defined a subset of specific objectives covering final prototyping, validation, and commercialisation readiness activities. Achieving them will bring us to a wide market uptake. 1) Technology maturation objectives (WP1) to optimise the functionalities of ECO-DRILLING’s subsystems and integrate them into the final prototype to be piloted in real-life settings, raising ECO-DRILLING TRL from TRL7 to TRL8. 2) Piloting and validation objectives (WP2) to demonstrate ECO-DRILLING’s technical and economic performance, functionality, and user benefits through a large-scale piloting in real-life operating settings, elevating eco-drilling from TRL8 to TRL9. 3) Commercialisation readiness objectives (WP3-6) enabling us to successfully bring the ECO-DRILLING service to the market and reach sales traction beyond Phase 2. Through the ECO-DRILLING SME Phase 2 project we will significantly boost the growth in our company. We estimate that by year 5 after project closure, we will reach accumulated revenues of €138.0m, generate at least 37 new full-time positions, and accumulate profits of €61.5m, with 6.42 ROI.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ECO-DRILLING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ECO-DRILLING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

sunlight2.0 (2018)

Highly efficient, solar-powered irrigation pump

Read More  

SEGE (2017)

Small Efficient Gas Engine

Read More