Opendata, web and dolomites

Plan4Res SIGNED

SYNERGISTIC APPROACH OF MULTI-ENERGY MODELS FOR AN EUROPEAN OPTIMAL ENERGY SYSTEM MANAGEMENT TOOL

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "Plan4Res" data sheet

The following table provides information about the project.

Coordinator
ELECTRICITE DE FRANCE 

Organization address
address: AVENUE DE WAGRAM 22
city: PARIS 08
postcode: 75008
website: www.edf.fr

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Project website http://www.plan4res.eu
 Total cost 3˙905˙060 €
 EC max contribution 3˙905˙060 € (100%)
 Programme 1. H2020-EU.3.3.4. (A single, smart European electricity grid)
 Code Call H2020-LCE-2017-SGS
 Funding Scheme RIA
 Starting year 2017
 Duration (year-month-day) from 2017-11-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ELECTRICITE DE FRANCE FR (PARIS 08) coordinator 998˙500.00
2    RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN DE (AACHEN) participant 598˙500.00
3    SIEMENS AKTIENGESELLSCHAFT DE (MUNCHEN) participant 533˙887.00
4    IMPERIAL COLLEGE OF SCIENCE TECHNOLOGY AND MEDICINE UK (LONDON) participant 485˙385.00
5    Konrad-Zuse-Zentrum für Informationstechnik Berlin DE (BERLIN) participant 484˙687.00
6    CRAY COMPUTER GMBH CH (BASEL) participant 432˙900.00
7    CONSORZIO INTERUNIVERSITARIO PER L'OTTIMIZZAZIONE E LA RICERCA OPERATIVA IT (BOLOGNA) participant 371˙200.00

Map

 Project objective

Plan4RES is a collaborative research and innovation project which aims at developing an end-to-end planning tool to successfully increase the share of renewable energy into the European Energy system without compromising on system reliability. The targeted platform will account for the Pan-European interconnected electricity system, potential synergies with other energy systems, emerging technologies and flexibility resources, providing a fully integrated modelling environment. Moving away from a monolithic approach will enable to overcome mathematical and computational challenges. The objective is to strive towards a system where a multiplicity of models, properly organized in a functional hierarchy, synergistically contribute to the analysis of such complex systems. Targeting all main stakeholders of the power system, from generation to retail through grid operators, this innovative modelling platform will deliver a full system planning capability while considering a large set of future uncertainties, thus acting as a decision making tool for future investments. Allocation of multi-energy resources, system flexibility, assets portfolio assessment, advanced ancillary services or impact assessment of regulation are among the key features that the tool will deliver. Three case studies will provide the necessary validation of the platform, showing the adequacy and relevance of the developed modelling framework, especially key advances included in Plan4Res (multi-energy integration, investment planning under uncertainties, TSO/DSO flexibility Cost integration…) and data base. Those studies, performed on a European scale, will also demonstrate the efficiency of the modelling and solving of the tool. Moreover, the case studies will demonstrate the benefit of using tailored versions of Plan4Res for various stakeholders: multi technology provider, TSO, utility or energy provider.

 Deliverables

List of deliverables.
Description of model interconnections Documents, reports 2019-10-03 18:12:43
Website Websites, patent fillings, videos etc. 2019-10-03 18:12:44
New version of the SCIP solver adapted and integrated in Plan4Res Platform Demonstrators, pilots, prototypes 2019-10-03 18:12:43
Report with the definition and requirements of three case studies Documents, reports 2019-10-03 18:12:45
New version of the StOpt library adapted to and integrated in Plan4Res Platform Demonstrators, pilots, prototypes 2019-10-03 18:12:42
Specification for the Plan4Res platform implementation Documents, reports 2019-10-03 18:12:43
Plan for Dissemination of Results Documents, reports 2019-05-31 11:54:50

Take a look to the deliverables list in detail:  detailed list of Plan4Res deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Ambros Gleixner, Leon Eifler, Tristan Gally, Gerald Gamrath, Patrick Gemander, Robert Lion Gottwald, Gregor Hendel, Christopher Hojny, Thorsten Koch, Matthias Miltenberger, Benjamin Müller, Marc E. Pfetsch, Christian Puchert, Daniel Rehfeldt, Franziska Schlösser, Felipe Serrano, Yuji Shinano, Jan Merlin Viernickel, Stefan Vigerske, Dieter Weninger, Jonas T. Witt, Jakob Witzig
The SCIP Optimization Suite 5.0
published pages: , ISSN: 1438-0064, DOI:
2019-08-05
2018 W. van Ackooij, I. Danti Lopez, A. Frangioni, F. Lacalandra, M. Tahanan
Large-scale unit commitment under uncertainty: an updated literature survey
published pages: 11-85, ISSN: 0254-5330, DOI: 10.1007/s10479-018-3003-z
Annals of Operations Research 271/1 2019-08-05
2018 Ambros Gleixner, Michael Bastubbe, Leon Eifler, Tristan Gally, Gerald Gamrath, Robert Lion Gottwald, Gregor Hendel, Christopher Hojny, Thorsten Koch, Marco E. Lübbecke, Stephen J. Maher, Matthias Miltenberger, Benjamin Müller, Marc E. Pfetsch, Christian Puchert, Daniel Rehfeldt, Franziska Schlösser, Christoph Schubert, Felipe Serrano, Yuji Shinano, Jan Merlin Viernickel, Matthias Walter, Fabian
The SCIP Optimization Suite 6.0
published pages: , ISSN: 1438-0064, DOI:
2019-08-05

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PLAN4RES" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PLAN4RES" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.4.)

TRINITY (2019)

TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY

Read More  

Smart4RES (2019)

Next Generation Modelling and Forecasting of Variable Renewable Generation for Large-scale Integration in Energy Systems and Markets

Read More  

CompBat (2020)

Computer aided desing for next generation flow batteries

Read More