The page lists 10 deliverables related to the research project "Net2DG".
title and desprition | type | last update |
---|---|---|
ICT Analysis and Gateway DesignD3.1 reports the ICT & Interface analysis findings: As well as the Risk and Fault Assessment outcomes. Furthermore, the design of the ICT Gateway is specified. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-17 |
First integrated deployment at Lab and TestbedD5.1 provides a description of the first available lab and field prototypes and reports on the preliminary results from these deployments. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Demonstrators, pilots, prototypes | 2020-02-12 |
First CBA and Business Model definitionD6.10 reports the results of a first cost-benefit analysis and defines potential business models for exploitation. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-12 |
Actuation Schemes and Control Coordination ApproachesD4.1 provides a description of the first realization of application specific actuation schemes (the SW implementation is part of a project internal Milestone), reports experiences from simulation experiments, and provides a description of approaches for control coordination Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Demonstrators, pilots, prototypes | 2020-02-12 |
Updated Baseline ArchitectureD1.3 provides an updated version of the baseline architecture based on D1.2 and the experiences from the other technical WPs so far Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-07 |
Public websiteD6.1 will be the public project website. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Websites, patent fillings, videos etc. | 2019-09-09 |
Initial Baseline ArchitectureD1.2 defines the first version of a generalized architecture entailing observbility, ICT, and actuation & control. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2019-09-09 |
Case Study Specification and Application RequirementsD1.1 provides a detailed description of the LV grid scenarios of the participating DSOs and describes the derived application requirements for the observability and control applications. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2019-09-09 |
Cost Benefit Analysis ApproachD6.9 describes the approach that will be used to obtain a cost-benefit analysis of the outcomes of the project. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2019-09-09 |
Dissemination StrategyD6.2 reports the dissemination activities during Year 1 and provides and updated strategy for dissemination in Year 2 and beyond. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2019-09-09 |