title and desprition type last update

ICT Analysis and Gateway Design

D3.1 reports the ICT & Interface analysis findings: As well as the Risk and Fault Assessment outcomes. Furthermore, the design of the ICT Gateway is specified.
Tasks: T3.1 and T3.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-17

First integrated deployment at Lab and Testbed

D5.1 provides a description of the first available lab and field prototypes and reports on the preliminary results from these deployments.
Tasks: T5.1 and T5.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

First CBA and Business Model definition

D6.10 reports the results of a first cost-benefit analysis and defines potential business models for exploitation.
Tasks: T6.3

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-12

Actuation Schemes and Control Coordination Approaches

D4.1 provides a description of the first realization of application specific actuation schemes (the SW implementation is part of a project internal Milestone), reports experiences from simulation experiments, and provides a description of approaches for control coordination
Tasks: T4.1 and T4.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Updated Baseline Architecture

D1.3 provides an updated version of the baseline architecture based on D1.2 and the experiences from the other technical WPs so far
Tasks: T1.3

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-07

Public website

D6.1 will be the public project website.
Task T6.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-09-09

Initial Baseline Architecture

D1.2 defines the first version of a generalized architecture entailing observbility, ICT, and actuation & control.
Tasks: T1.3

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2019-09-09

Case Study Specification and Application Requirements

D1.1 provides a detailed description of the LV grid scenarios of the participating DSOs and describes the derived application requirements for the observability and control applications.
Tasks: T1.1 and T1.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2019-09-09

Cost Benefit Analysis Approach

D6.9 describes the approach that will be used to obtain a cost-benefit analysis of the outcomes of the project.
Tasks: T6.3

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2019-09-09

Dissemination Strategy

D6.2 reports the dissemination activities during Year 1 and provides and updated strategy for dissemination in Year 2 and beyond.
Tasks: T6.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2019-09-09