Opendata, web and dolomites

Andromeda SIGNED

Predictive Maintenance for railway switches. Smart sensor networks on a machine learninganalytics platform

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Andromeda project word cloud

Explore the words cloud of the Andromeda project. It provides you a very rough idea of what is the project "Andromeda" about.

machine    mechanical    2010    network    learning    konux    business    time    re    track    levels    switches    self    total    shorter    110    manual    investment    avoidable    solely    000    linked    caused    financial    acquisition    fatigue    failures    changing    responsible    opportunity    unacceptable    19    holistic    estimation    maintenance    fact    dangerous    30b    outcome    stress    railway    oversight    freight    12    calibrating    alone    2030    spending    34    delays    smart    sensors    inaccurate    600    andromeda    pulls    monitoring    92    180    volumes    error    rail    infrastructure    generally    inspections    potentially    predicted    switch    510    health    promises    losses    worldwide    endure    trains    respectively    passenger    critical    active    derailments    global    train    route    actively    dependent    data    40    preventive    additional    4b    minutes    expensive    prone    lack    analytics    revolutionize    permanently    overview   

Project "Andromeda" data sheet

The following table provides information about the project.

Coordinator
KONUX GmbH 

Organization address
address: FLÖßERGASSE 2
city: München
postcode: 81369
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website https://www.konux.com
 Total cost 2˙155˙000 €
 EC max contribution 1˙508˙500 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-12-01   to  2019-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KONUX GmbH DE (München) coordinator 1˙508˙500.00

Map

 Project objective

92.000.000 minutes, or 180 years. These are the, potentially avoidable, train delays caused by problems due to rail switches – every year, in Europe alone. The rail switch is a critical component of the rail-infrastructure. It is responsible for actively changing the route of trains, and must therefore endure higher levels of stress and mechanical fatigue than other elements of the rail infrastructure. Failures at track switches can result in expensive delays, or even dangerous derailments. In fact, track switches account for 19% of the delays, and have been linked to 110 derailments since 2010. It is therefore unacceptable that most of the monitoring of critical switches is solely dependent on manual inspections, since they are prone to measurement error and lack of global oversight. The outcome is generally an inaccurate estimation of the State-of-Health of each switch and re-active – not preventive – maintenance, with financial losses due to delays or additional investment in infrastructure maintenance. European spending on railway switches is currently over 4B€ (30B€ worldwide). Furthermore, passenger and freight volumes are expected to increase respectively by 34% and 40% by 2030, which means shorter infrastructure access time for maintenance and monitoring. KONUX has developed the ANDROMEDA system, which promises to revolutionize the maintenance procedures for rail infrastructure. The system pulls data from sensors deployed permanently at the rail switch, which means no more expensive and manual data acquisition. Through self-calibrating smart sensors and machine learning analytics, the result is a holistic overview of the whole rail switch network, with current - and predicted - State-of-Health for each switch. With a total of 600.000 switches in Europe and 2.510.000 switches worldwide, the ANDROMEDA project represents a 12,4B€ business opportunity.

 Deliverables

List of deliverables.
Success-stories’ report Documents, reports 2020-04-24 05:53:10
Website Websites, patent fillings, videos etc. 2020-04-24 05:53:10

Take a look to the deliverables list in detail:  detailed list of Andromeda deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ANDROMEDA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ANDROMEDA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

STYLUS (2017)

Sustainable urban mobiliTY: ELectric double decker bUS

Read More