Opendata, web and dolomites

LTT SIGNED

Long-term testing of airtightness to increase energy efficiency in buildings.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 LTT project word cloud

Explore the words cloud of the LTT project. It provides you a very rough idea of what is the project "LTT" about.

rate    projections    40    revenue    annual    money    profit    50    zero    upfront    55    26    mwh    36    237    co2    savings    point    services    24    2020    attaining    public    reducing    259    leaking    residential    energy    implementing    performance    period    society    2m    quantified    ventilation    adjust    compound    leakage    solution    rapid    airtightness    successful    4bn    renewable    selling    strategy    27    ec    clients    air    venturigo    employments    create    2017    reduce    3m    alternative    solutions    measurable    efficiency    jobs    company    efficient    buildings    163    monitoring    time    commercialisation    full    203    nearly    sense    accumulated    lower    consumption    market    1bn    technologies    x100    indirect    directive    emissions    payback    2026    feasibility    sustainable    first    usp    0m    2018    ltt    296    designed    responsible    building    respectively    690    months    cagr    projected    successfully    highlights    29    58    economy   

Project "LTT" data sheet

The following table provides information about the project.

Coordinator
AIRTIGHT AS 

Organization address
address: OSLO SCIENCE PARK GAUSTADALLEEN 21
city: OSLO
postcode: 349
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website https://www.airtight.ai
 Total cost 2˙452˙800 €
 EC max contribution 1˙716˙960 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-08-01   to  2020-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AIRTIGHT AS NO (OSLO) coordinator 1˙716˙960.00

Map

 Project objective

The LTT Phase 2 project is designed to address and implement the findings of our Feasibility Study and to enable a rapid and successful commercialisation of our Long-term testing of airtightness (LTT) technology. Venturigo has developed the only solution in the market capable of monitoring 24/7 how much air, energy and money are leaking in a given building, and to adjust the ventilation system to reduce this leakage by an average of 50%. LTT has x100 lower upfront cost than alternative solutions in the market for improving airtightness, and a 5.8/6.9 months payback period in high-rise residential buildings and large services buildings, respectively, a major advancement over the current state-of-the-art and our unique selling point (USP). The EC Nearly Zero-Energy Building Strategy 2020 highlights the importance of a sustainable European economy and society based on the efficient use of resources and renewable energy. In this sense, while buildings are now responsible for 40% of energy consumption and 36% of CO2 emissions in the EU, the Energy Performance of Buildings Directive requires all new buildings to be nearly zero-energy by the end of 2020 and all new public buildings by 2018. LTT will help to face these challenges by reducing buildings CO2 emissions by 690,296 tonnes and will offer our clients accumulated energy and cost savings of 1,237 MWh and €203.2m, respectively during the first 5 years of commercialisation according to our 5-years projections. LTT addresses the large and growing market of technologies for improving energy-efficiency in buildings, which is projected to increase from €163.4bn in 2017 to €259.1bn in 2026 attaining a compound annual growth rate (CAGR) of 5.26%. By successfully implementing the LTT project, we expect to create a measurable impact on Venturigo quantified as increased accumulated revenue of €58.3m and profit of €27.0m, creating 29 full time employments in our company and 55 indirect jobs in Europe.

 Deliverables

List of deliverables.
LTT website Websites, patent fillings, videos etc. 2019-09-13 15:28:52

Take a look to the deliverables list in detail:  detailed list of LTT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LTT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LTT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Magnesys (2019)

Efficient filtering of metallic impurities in food processing

Read More  

COUNTMITMENT (2019)

NATURAL CAPITAL ACCOUNTANCY TO IMPROVE REPORTING AND ENVIRONMENTAL PERFORMANCE

Read More  

LIVELMIA (2019)

Innovative assay for microRNAs analysis

Read More