Opendata, web and dolomites

WEO project deliverables

The page lists 5 deliverables related to the research project "WEO".

 List of Deliverables

WEO: list of downloadable deliverables.
title and desprition type last update

Final report

1.2 Final report: the manager will generate via the IT system and sign-off on final report.

Programme: H2020-EU.3.3. - Topic(s): IBA-SC3-IEA-2017

download deliverable 

Documents, reports 2019-10-01

Advance copy of the final technical report

IEA is asking for a contract amendment extending the duration of the contract until the end of July, and like this the IEA will have time to submit the certificate until the end of September. The duration of the project has been changed from 13 to 17 months, but all of the deliverables will be summited according to previous schedule (including an “advance” copy of the final technical report in month 13). The “final” summary of financial statements and the certificate will be submitted by end of September.

Programme: H2020-EU.3.3. - Topic(s): IBA-SC3-IEA-2017

download deliverable 

Documents, reports 2019-10-01

Press, web & social media communication

4.3 Press, web & social media communication: The findings of the Energy Union analysis is intended to be communicated with other WEO-2018 analysis through targeted press, web and social medial channels. Proposed timing: March 2019.

Programme: H2020-EU.3.3. - Topic(s): IBA-SC3-IEA-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

International launch

4.1 International launch: WEO-2018, which will include the findings of the Energy Union analysis, will be launched to international press in London. Proposed timing: November 2018.

Programme: H2020-EU.3.3. - Topic(s): IBA-SC3-IEA-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-03-26

Brussels launch

4.2 Brussels launch: A tailored launch of the findings of the Energy Union analysis would be made in Brussels in the presence of senior representatives from the European Union. Proposed timing: November 2018.

Programme: H2020-EU.3.3. - Topic(s): IBA-SC3-IEA-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-03-26