Opendata, web and dolomites

SIDEWIND SIGNED

Horizontal wind turbines for maritime transport ships

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SIDEWIND project word cloud

Explore the words cloud of the SIDEWIND project. It provides you a very rough idea of what is the project "SIDEWIND" about.

era    hull    customers    stage    wasted    heavily    despite    un    converting    2017    flettner    gas    mandates    hedinn    ghgs    fuel    328k    origins    samskip    flexible    40    energy    greenhouse    ec    niche    ports    150    engineering    sidewind    horizontal    public    container    green    ministry    players    electricity    breakthrough    ship    incorporates    made    solution    seaports    tackling    soft    innovation    fishing    kinetic    opening    shipping    international    80    companies    provider    source    vessels    failing    industries    rotors    designed    market    emissions    efforts    builders    shipyards    329    natural    sails    calling    kite    recycled    transport    turbines    entities    installing    vision    feasible    fixed    wind    builder    million    utilize    inside    183    60    situation    rafnar    transports    23    save    standard    tons    translated    industry    940    ships    fossil    count    tails    global    containers    dependent    cargo       play    trade    environment    propel    power    practical    co2    maritime    back    harnessing   

Project "SIDEWIND" data sheet

The following table provides information about the project.

Coordinator
SIDEWIND EHF 

Organization address
address: SOLEYJARIMA 33
city: REYKJAVIK
postcode: 112
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Iceland [IS]
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2020-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SIDEWIND EHF IS (REYKJAVIK) coordinator 50˙000.00

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

International shipping is a large and growing source of greenhouse gas emissions (GHGs). It transports 80% of the global trade at the cost of 940 million CO2 tons (2.5% of global GHGs). Despite mandates from the EC or the UN on tackling this situation, the industry remains heavily fossil-fuel dependent. Some efforts are being made in harnessing the wind to propel ships, going back to its origins. These are soft-tails, fixed-sails, flettner rotors, kite sails and even some wind turbines. However, they all remain at the research stage failing to represent a feasible and reliable power source. Sidewind is a breakthrough innovation in the use of wind power in transport ships. Designed to utilize the wind energy that is wasted around cargo ships by converting that energy (kinetic) into electricity, Sidewind incorporates horizontal turbines inside recycled cargo containers. This results in a flexible, practical and cost-effective solution to the maritime transport sector, without the need for major changes in the ship. By installing just 20 turbines (standard cargo ship), a ship will save 40% average fossil fuel and energy, translated in €328k per year. The EU has 329 key seaports, controlling around 60% of all container cargo ships. Our customers are maritime transport companies (183 in Europe, managing 23,000 vessels) and ship builders (150 shipyards in the EU). The number of vessels calling in the main EU ports in 2017 was estimated at above 2.1 million, and we will target the most important shipping companies. We count with support from public entities (Ministry for the Environment and Natural Resources, Ministry of industries and innovation) and key industry players like Samskip (maritime transport), Hedinn (engineering in fishing industry) and Rafnar Hull (ship builder). Sidewind is opening a new market niche as provider of wind technology for the maritime transport. Our vision for Sidewind is to play the leading role in a new green shipping era

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SIDEWIND" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SIDEWIND" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

RDNA (2019)

Empowering New Venture Growth - RDNA

Read More  

Totem Spoon (2019)

Interactive Digital Signage with emotional intelligence for smart cities

Read More  

SIMCARE (2019)

SImulation-assisted Minimally invasive CAncer tREatment using the gosmart environment

Read More