This page shows the list of projects involved in the programme "Develop the full potential of wind energy (H2020-EU.3.3.2.1.)" of the Horizon 2020 Framework Research Programme.
Following table lists the European H2020 projects involved in the "H2020-EU.3.3.2.1." programme. Projects are ordered by starting date.
Click on table headers to rearrange data.
# | acronym | start | total cost | EC contribution | code call |
---|---|---|---|---|---|
1 | AURES | 2015 | 1˙552˙600 | 1˙552˙600 | H2020-LCE-2014-3 |
2 | RiCORE | 2015 | 1˙393˙532 | 1˙393˙532 | H2020-LCE-2014-3 |
3 | IndustRE | 2015 | 1˙897˙227 | 1˙897˙227 | H2020-LCE-2014-3 |
4 | PV FINANCING | 2015 | 2˙050˙938 | 2˙050˙938 | H2020-LCE-2014-3 |
5 | CrowdFundRES | 2015 | 1˙994˙915 | 1˙893˙002 | H2020-LCE-2014-3 |
6 | EcoSwing | 2015 | 13˙846˙593 | 10˙591˙733 | H2020-LCE-2014-2 |
7 | progRESsHEAT | 2015 | 1˙728˙305 | 1˙728˙305 | H2020-LCE-2014-3 |
8 | Sharc25 | 2015 | 6˙152˙979 | 4˙563˙122 | H2020-LCE-2014-1 |
9 | CAPTure | 2015 | 6˙461˙970 | 6˙104˙032 | H2020-LCE-2014-1 |
10 | CPVMatch | 2015 | 4˙949˙596 | 4˙949˙596 | H2020-LCE-2014-1 |
11 | DESCRAMBLE | 2015 | 15˙687˙222 | 6˙753˙635 | H2020-LCE-2014-1 |
12 | ORC-PLUS | 2015 | 7˙297˙148 | 6˙249˙316 | H2020-LCE-2014-2 |
13 | GEOTeCH | 2015 | 9˙025˙458 | 7˙136˙662 | H2020-LCE-2014-2 |
14 | FlexiFuel-SOFC | 2015 | 5˙988˙163 | 5˙982˙101 | H2020-LCE-2014-1 |
15 | Riblet4Wind | 2015 | 4˙031˙852 | 3˙307˙171 | H2020-LCE-2014-2 |
16 | LIFES 50plus | 2015 | 7˙274˙837 | 7˙274˙837 | H2020-LCE-2014-1 |
17 | Bio-HyPP | 2015 | 5˙775˙868 | 5˙775˙868 | H2020-LCE-2014-1 |
18 | CEFOW | 2015 | 24˙744˙113 | 16˙998˙022 | H2020-LCE-2014-2 |
19 | Cheap-GSHPs | 2015 | 5˙717˙356 | 4˙844˙652 | H2020-LCE-2014-2 |
20 | PreFlexMS | 2015 | 17˙688˙612 | 14˙362˙194 | H2020-LCE-2014-2 |
21 | ThermoDrill | 2015 | 5˙824˙745 | 5˙380˙995 | H2020-LCE-2014-1 |
22 | TELWIND | 2015 | 3˙498˙530 | 3˙498˙530 | H2020-LCE-2015-1-two-stage |
23 | DEEPEGS | 2015 | 42˙173˙550 | 18˙982˙937 | H2020-LCE-2015-2 |
24 | WASCOP | 2016 | 5˙941˙607 | 5˙941˙607 | H2020-LCE-2015-1-two-stage |
25 | Residue2Heat | 2016 | 5˙466˙478 | 5˙465˙728 | H2020-LCE-2015-1-two-stage |
26 | MinWaterCSP | 2016 | 5˙861˙371 | 5˙861˙371 | H2020-LCE-2015-1-two-stage |
27 | SOLPART | 2016 | 4˙558˙687 | 4˙366˙562 | H2020-LCE-2015-1-two-stage |
28 | DEMOGRAVI3 | 2016 | 26˙523˙602 | 19˙037˙465 | H2020-LCE-2015-2 |
29 | CoolHeating | 2016 | 1˙644˙340 | 1˙644˙340 | H2020-LCE-2015-3 |
30 | PowerKite | 2016 | 5˙074˙363 | 5˙074˙363 | H2020-LCE-2015-1-two-stage |
31 | FlexiFuel-CHX | 2016 | 4˙309˙610 | 3˙514˙397 | H2020-LCE-2015-1-two-stage |
32 | ELICAN | 2016 | 17˙107˙301 | 11˙181˙986 | H2020-LCE-2015-2 |
33 | CHPM2030 | 2016 | 4˙235˙567 | 4˙235˙567 | H2020-LCE-2015-1-two-stage |
34 | PVSITES | 2016 | 8˙490˙472 | 5˙467˙611 | H2020-LCE-2015-2 |
35 | FloTEC | 2016 | 22˙044˙231 | 9˙782˙380 | H2020-LCE-2015-2 |
36 | SDHp2m | 2016 | 2˙087˙297 | 1˙919˙297 | H2020-LCE-2015-3 |
37 | GeoWell | 2016 | 4˙704˙913 | 4˙704˙913 | H2020-LCE-2015-1-two-stage |
38 | CHEOPS | 2016 | 5˙042˙913 | 3˙299˙095 | H2020-LCE-2015-1-two-stage |
39 | OPERA | 2016 | 5˙741˙263 | 5˙741˙263 | H2020-LCE-2015-1-two-stage |
40 | UPWAVE | 2016 | 28˙866˙787 | 20˙722˙489 | H2020-LCE-2015-2 |
41 | DESTRESS | 2016 | 24˙713˙964 | 10˙713˙408 | H2020-LCE-2015-2 |
42 | SURE | 2016 | 6˙143˙415 | 5˙892˙165 | H2020-LCE-2015-1-two-stage |
43 | BestRES | 2016 | 1˙994˙812 | 1˙994˙812 | H2020-LCE-2015-3 |
44 | DEMOTIDE | 2017 | 47˙999˙416 | 20˙301˙149 | H2020-LCE-2015-2 |
- | - | - | 435˙308˙518.00 | 300˙132˙975.00 | - |