Opendata, web and dolomites

JOS

JOS, the first electrified Energy Surface with high efficiency, high power and high energy savings for the wireless charging of all low voltage devices.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 JOS project word cloud

Explore the words cloud of the JOS project. It provides you a very rough idea of what is the project "JOS" about.

wall    integration    environment    elimination    cables    protect    insulation    fed    adaptable    charging    electromagnetic    social    extensible    context    lighting    efficiency    customization    b2c    huge    contexts    voltage    numberless    flexibility    position    photovoltaic    custom    wires    phases    enjoy    feasibility    wiring    batteries    virtue    disability    jos    powered    co2    business    series    answer    b2b    positioning    electronic    first    power    near    energy    25    structural    device    formats    models    spaces    true    offers    thermal    multiplying    alternative    panel    types    interventions    longer    table    polluting    double    sound    simplifying    markets    inner    market    savings    facilitation    saving    exploitable    single    electrified    electronics    time    supply    proposition    patented    panels    plus    functional    ceiling    absorption    direct    emissions    surface    connection    healthiness    traces    installation    feed   

Project "JOS" data sheet

The following table provides information about the project.

Coordinator
JOS TECHNOLOGY 

Organization address
address: VIA ARTIGIANI 29/31
city: VIGOLZONE PC
postcode: 29020
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.jostechnology.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-12-01   to  2016-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    JOS TECHNOLOGY IT (VIGOLZONE PC) coordinator 50˙000.00

Map

 Project objective

JOS is the first Energy Surface with high-power and energy efficiency, a patented lighting and charging device system. It’s a low-voltage electrified panel, on which it’s possible to feed any electronic device without any cables, in numberless position and with an energy saving of up to 25% compared with traditional systems. JOS can also be powered with direct photovoltaic and it’s extensible in series even on very large areas, so to use a single power supply and protect the environment. All spaces fed with JOS will enjoy a strong reduction of electromagnetic emissions. The panel has the virtue of thermal insulation and sound absorption, exploitable in the context of inner installation. JOS technology offers a very different technology and is characterized by: INTEGRATION of all types of devices, HIGH POWER (100 W per connection), FLEXIBILITY in positioning (table, wall, ceiling), ENERGY SAVING, CUSTOMIZATION (functional and design). JOS is not just a product but a technology with a double value proposition, both B2C and B2B. JOS B2C - Consumer Electronics, huge market. PLUS: integration, savings, flexibility, elimination of wires. JOS B2B - Great alternative or integration to traditional installation - panels of custom formats, extensible in series with specific devices. PLUS: reduction of time and costs in all phases, no longer traces or wiring, or structural interventions for changes, electromagnetic healthiness, energy saving. A technology adaptable to many different contexts, including disability, multiplying and simplifying the access to energy, with a strong facilitation of social and working conditions. Because JOS is a system with many possible applications, the feasibility study will be particularly aimed at the study of various business models, according to the different contexts and at detailed analysis of the various markets. The first true answer to avoid the need of CO2 polluting batteries in the near future.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "JOS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "JOS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

EcoMultiCloud (2015)

Hierarchical Approach for Green Workload Management in Distributed Data Centers reducing energy bill and carbon footprint

Read More  

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

iDriver (2015)

iDriver

Read More