Explore the words cloud of the EMPOWERING project. It provides you a very rough idea of what is the project "EMPOWERING" about.
The following table provides information about the project.
Coordinator |
SVILUPPO MARCHE SRL
Organization address contact info |
Coordinator Country | Italy [IT] |
Project website | http://www.empowering-project.eu |
Total cost | 1˙497˙003 € |
EC max contribution | 1˙497˙003 € (100%) |
Programme |
1. H2020-EU.3.3.7. (Market uptake of energy innovation - building on Intelligent Energy Europe) |
Code Call | H2020-EE-2015-3-MarketUptake |
Funding Scheme | CSA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-02-01 to 2019-07-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | SVILUPPO MARCHE SRL | IT (ANCONA) | coordinator | 344˙912.00 |
2 | RISE RESEARCH INSTITUTES OF SWEDEN AB | SE (BORAS) | participant | 265˙862.00 |
3 | AGENCIA DE MEDIO AMBIENTE Y AGUA DE ANDALUCIA | ES (SEVILLA) | participant | 227˙895.00 |
4 | CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING FONDATION | EL (PIKERMI) | participant | 157˙337.00 |
5 | Agentia pentru Dezvoltare Regionala Nord-Est | RO (Piatra Neamt) | participant | 147˙518.00 |
6 | ISTARSKA RAZVOJNA AGENCIJA, DRUSTVO ZA OBRADU PODATAKA, SAVJETOVANJE I ZASTUPANJE, DOO | HR (PULA) | participant | 128˙375.00 |
7 | BORA 94 BORSOD-ABAUJ-ZEMPLEN MEGYEIFEJLESZTESI UGYNOKSEG KOZHASZNU NONPROFIT KORLATOLT FELELOSSEGU TARSASAG | HU (MISKOLC) | participant | 114˙752.00 |
8 | REGION OF CENTRAL MACEDONIA | EL (THESSALONIKI) | participant | 110˙350.00 |
9 | NORDA ESZAK-MAGYARORSZAGI REGIONALIS FEJLESZTESI UGYNOKSEG KOZHASZNU nonprofit KORLATOLT FELELOSSEGU TARSASAG | HU (MISKOLC) | participant | 0.00 |
EMPOWERING proposal contributes to the shift of 6 EU regions toward low-carbon society by enhancing the capacities of municipalities and regional representatives to shape integrated energy strategies and plans. The project contributes to bridge the gap of skills needed to plan energy measures in the new 2030 framework for Climate and Energy Policy in terms of GHG emission reduction, renewable energy and energy efficiency. EMPOWERING addresses energy saving challenges involving local municipalities and regional authorities in a sound transnational exchange and learning activities (WP3) including: a) transnational seminars; b) peer to peer exchange for regional authorities; c) study visit to one EU best practice and two partners’ best practice. Local target audience is then effectively reached thanks to ad hoc capacity local building measures (WP4) addressing different target groups to maximize the learning experience. The improved knowledge and competences of local authorities are put into practice during the development of the mitigation part of SECAPs and in the upgrading of the existing SEAPs, while regional authorities are supported in shaping regional energy vision to 2050 highlighting the main energy challenges and identifying possible financial strategic actions to be implemented (WP5). The proposal is built on a solid and innovative strategic planning methodology which has a high replicability potential, strengthening the European added value of the project. This process is triggered by the cooperation of a comprehensive partnership, which involves technical-scientific partners and regional development agencies, creating the conditions to achieve project’s objectives.
N. 47 (at least) SEAPs updated in national language, including a strategic vision to 2050 and with executive summary in EN (incl. BEI) | Documents, reports | 2020-03-23 18:49:15 |
N. 47 (at least) of Municipal Council Decisions for SEAPs upgrading | Documents, reports | 2020-03-23 18:49:24 |
N. 30 (at least) SECAPs (mitigation part only) drafted in national language including a strategic vision to 2050 and with executive summary in EN (including BEI) | Documents, reports | 2020-03-23 18:49:34 |
1 article published on EU specialized magazins+1 appearance on national newspapers in each region for the 2nd project year | Websites, patent fillings, videos etc. | 2020-03-23 18:49:57 |
N. 1 model for financial tool in each region | Documents, reports | 2020-03-23 18:49:24 |
1 article published on EU specialized magazins+1 appearance on national newspapers in each region for the 3rd project year | Websites, patent fillings, videos etc. | 2020-03-23 18:50:01 |
1 article published on EU specialized magazins+1 appearance on national newspapers in each region for the 1st project year | Websites, patent fillings, videos etc. | 2020-03-23 18:49:24 |
N. 30 (at least) of Municipal Council Decision for SECAPs (mitigation part only) drafting acknowledgement | Documents, reports | 2020-03-23 18:49:17 |
N. 1 regional energy vision to 2050 drafted for each region | Documents, reports | 2020-03-23 18:49:12 |
N. 30 (at least) municipal decisions for new CoM members | Documents, reports | 2020-03-23 18:49:12 |
At least 2 workshops for regional representatives in each region | Documents, reports | 2020-03-13 10:24:10 |
5th and 6th SC Meetings Agendas, minutes and material | Documents, reports | 2020-03-13 10:24:09 |
Strategic innovative planning model standardization | Documents, reports | 2020-03-13 11:19:22 |
Training Programme (including training modules, materials and tools) | Documents, reports | 2020-03-13 10:24:08 |
6 Capacity building programmes | Documents, reports | 2020-03-13 10:24:03 |
At least 3 workshops in each region for SECAPs definition | Documents, reports | 2020-03-13 10:24:07 |
At least 3 press releases for the 3rd year in each region | Websites, patent fillings, videos etc. | 2020-03-13 10:23:11 |
Peer to peer reports | Documents, reports | 2020-03-13 10:24:11 |
Final project brochure | Websites, patent fillings, videos etc. | 2020-03-13 10:24:06 |
5th, 6th and 7th (extra) monthly e-Newsletters | Documents, reports | 2020-03-13 10:23:16 |
Seminar reports summing up the main lessons learnt | Documents, reports | 2020-03-13 10:24:03 |
Final evaluation report | Documents, reports | 2020-03-13 10:24:08 |
3rd, 4th and 5th reports to monitor project performance indicators | Documents, reports | 2020-03-13 10:23:14 |
At least 3 workshops in each region for SEAPs review and updating | Documents, reports | 2020-03-13 10:24:01 |
At least 3 press releases for the 2nd year in each region | Websites, patent fillings, videos etc. | 2020-03-13 10:23:12 |
1 Project Communication Plan (including media relation strategy and common layout for dissemination activities) | Documents, reports | 2020-02-25 11:18:16 |
Study visit reports smming up the main lessons learnt | Documents, reports | 2020-02-25 11:18:16 |
Capacity building guidelines | Documents, reports | 2020-02-25 11:18:16 |
3rd and 4th monthly e-Newsletters | Documents, reports | 2020-02-25 11:18:13 |
Project Visual Identity (logo, folders, roll ups, poster format, ppt format, reports layout) | Websites, patent fillings, videos etc. | 2020-02-25 11:18:12 |
Draft of the study visit reports summing up the main lessons learnt | Documents, reports | 2020-02-25 11:18:14 |
1 Launching Seminar material (agenda, presentations, attendance list) | Documents, reports | 2020-02-25 11:18:12 |
1 questionnaire format to monitor project performance indicators | Documents, reports | 2020-02-25 11:18:16 |
3rd and 4th SC Meetings Agendas, minutes and material | Documents, reports | 2020-02-25 11:18:13 |
Draft of the capacity building guidelines | Documents, reports | 2020-02-25 11:18:14 |
Capacity building needs analysis and mapping of regional and municipal capabilities as results of e-questionnaires collected | Documents, reports | 2020-02-25 11:18:13 |
Leaflet, fact sheets and posters in EN and NATIONAL language | Websites, patent fillings, videos etc. | 2020-02-25 11:18:12 |
Monitoring and Evaluation Plan | Documents, reports | 2020-02-25 11:18:15 |
Draft of the seminar reports summing up the main lessons learnt | Documents, reports | 2020-02-25 11:18:14 |
LEB set up in each region + LEB regulation signed by all members | Other | 2020-02-25 11:18:13 |
Empowering project’s videoclip | Websites, patent fillings, videos etc. | 2020-02-25 11:18:13 |
At least 3 press releases for the 1st year in each region | Websites, patent fillings, videos etc. | 2020-02-25 11:18:13 |
Collection of best practices at partner and EU level | Documents, reports | 2020-02-25 11:18:13 |
1st and 2nd reports to monitor project performance indicators | Documents, reports | 2020-02-25 11:18:12 |
1st and 2nd monthly e-Newsletters | Documents, reports | 2020-02-25 11:18:13 |
1 Transnational exchange programme | Documents, reports | 2020-02-25 11:18:14 |
Draft of the peer to peer reports | Documents, reports | 2020-02-25 11:18:14 |
1 Progress Report (simplified) | Documents, reports | 2020-02-25 11:18:15 |
1st and 2nd SC Meetings Agendas, minutes and material | Documents, reports | 2020-02-25 11:18:13 |
Handbook on quality control procedures and standards (including the risk assessment plan) | Documents, reports | 2020-02-25 11:18:14 |
Project Financial Guidelines | Documents, reports | 2020-02-25 11:18:15 |
Take a look to the deliverables list in detail: detailed list of EMPOWERING deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EMPOWERING" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "EMPOWERING" are provided by the European Opendata Portal: CORDIS opendata.