Opendata, web and dolomites

InToTidal SIGNED

Demonstration of Integrated Solution for offshore Tocardo Tidal power plants.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "InToTidal" data sheet

The following table provides information about the project.

Coordinator
THE EUROPEAN MARINE ENERGY CENTRE LIMITED 

Organization address
address: BACK ROAD OLD ACADEMY
city: STROMNESS
postcode: KW16 3AW
website: http://www.emec.org.uk

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.tocardo.com/Project/intotidal/
 Total cost 2˙891˙523 €
 EC max contribution 2˙000˙000 € (69%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2016-1
 Funding Scheme IA
 Starting year 2017
 Duration (year-month-day) from 2017-01-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    THE EUROPEAN MARINE ENERGY CENTRE LIMITED UK (STROMNESS) coordinator 240˙315.00
2    LEASK MARINE LIMITED UK (ORKNEY) participant 1˙271˙891.00
3    TOCARDO INTERNATIONAL BV NL (DEN OEVER) participant 330˙795.00
4    TOCARDO SOLUTIONS BV NL (DEN OEVER) participant 131˙943.00
5    INSTITUT FRANCAIS DE RECHERCHE POUR L'EXPLOITATION DE LA MER FR (PLOUZANE) participant 25˙054.00

Map

 Project objective

Tocardo International has in the past ten years developed a technology for tidal turbines for generating tidal power from flowing water. For offshore application, integrated tidal system are needed that require low upfront investments (CAPEX), have low maintenance and operation costs (OPEX) and produce large amount of kWh. Tocardo International has developed an solution which fulfils these requirements.

The objective of the InToTidal project is to execute the last step of the develop and demonstration of an integrated and generic solution for offshore tidal energy production, making it ready for successful commercial business application. The system will be tested and demonstrated in this project, while the resulting system will be used for long term testing after the project.

Tocardo formed a strong consortium with EMEC, Infremer and LEASK Marine to be able to make this project a success. With a large market potential and strong competitive position, Tocardo is able to grow into a strong and powerful company with annual turnover of more than 180 Mio Euro per year within 3 years (providing work to 60 own employed FTE’s in 2020) and growing towards a 1,0 Billion euro turnover in 2025 providing jobs for 600 own personnel in 2025 as well as >1000 jobs in the supply chain.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTOTIDAL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INTOTIDAL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

BIOCOMPLACK (2016)

Eco-friendly food packaging with enhanced barrier properties

Read More