Opendata, web and dolomites

DUSTCOMB

A Novel Method to Reduce Industrial Dust Pollution of Respirable Air

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 DUSTCOMB project word cloud

Explore the words cloud of the DUSTCOMB project. It provides you a very rough idea of what is the project "DUSTCOMB" about.

market    asia    metals    coming    fluid    finland    steel    approximately    phenomena    dust    operations    reached    regulations    smei    manufacturing    plant    excellent    meet    seek    off    compatibility    feasibility    oulu    generate    confirmed    particulate    close    dynamics    90    urgent    extraction    additional    provider    2017    efficiency    capacity    demand    finalize    ratio    meets    group    helps    industrial    revolutionary    solutions    vai    exchange    ssab    regular    prepared    turnover    2020    annual    acute    analysed    business    comply    agreements    globally    power    validated    spin    sales    300    team    clients    units    jobs    emissions    innovative    siemens    filtration    200    revenue    emission    filtra    preliminary    evolve    tolerance    dustcomb    tests    plants    installation    secured    plan    400    leads    quality    gives    air    maintenance    million    roadmap    oriented    fast    retrofitting    oy    standards    norms    temperature    benefits    industries    heat    installing    commercialisation    university    investors   

Project "DUSTCOMB" data sheet

The following table provides information about the project.

Coordinator
FILTRA GROUP OY 

Organization address
address: SIIPIPEILINTIE 4A6
city: OULU
postcode: 90420
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Finland [FI]
 Project website http://filtragroup.fi/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-03-01   to  2017-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FILTRA GROUP OY FI (OULU) coordinator 50˙000.00

Map

 Project objective

A spin-off from University of Oulu (Finland), Filtra Group Oy, has developed a revolutionary industrial dust extraction technology that gives 90% cost reduction compared to current state-of-the-art solutions.

Our DustComb system addresses directly the urgent need for various industries (e.g. power plants, metals processing plants, etc.) to meet new air quality regulations that demand better extraction of particulate matter from the industrial emissions.

Today, various emission regulations affect around 200,000 industrial units globally that need to comply with new emission norms by installing advanced filtration units in the coming years or close their operations.

DustComb has been already validated in operational tests in SSAB steel plant and the results confirmed that our innovative fluid dynamics phenomena based technology meets all required emission standards. In addition, DustComb´s excellent cost-efficiency ratio, retrofitting compatibility, wide operating temperature tolerance, unique heat exchange feature, low maintenance costs, and other key benefits will ensure us fast market uptake globally.

We have already reached to preliminary agreements with several potential clients in Europe and Asia via our industrial partners SSAB and Siemens VAI.

We will generate our revenue from DustComb units’ sales and regular maintenance. By 2020, we plan to reach annual installation capacity of 400 DustComb units, which leads to approximately €100 million turnover and 300 new jobs.

Today, we have secured all necessary resources and experienced team to finalize our technology development and evolve to sales-oriented emission control solutions provider.

As a result of the SMEI phase-1 project, we have analysed the feasibility of our business, manufacturing and commercialisation plan and have prepared a detailed roadmap for 2017-2020. The result of the phase-1 project helps us to seek additional funding both from EU-programmes and from other investors.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DUSTCOMB" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DUSTCOMB" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

EPIC (2017)

Environmentally Friendly Recycled Plastic Floors in Containers

Read More  

ProTreaT (2015)

FEASIBILITY ASSESSMENT OF THE GREEN “ProTreaT” TECHNOLOGY FOR PROTEIN-BASED, NATURAL REMOVAL OF HEAVY METALS FROM WATER AND WASTEWATER

Read More  

DUSTCOMB (2018)

A Novel Technology to Reduce Industrial Dust Pollution and to Enable Most Efficient Energy Recovery

Read More