Opendata, web and dolomites

SMILE project deliverables

The page lists 17 deliverables related to the research project "SMILE".

 List of Deliverables

SMILE: list of downloadable deliverables.
title and desprition type last update

Infrastructure preparation and kick-off

Document providing evidence of the installed communication infrastructure and smart metering hardware and of the deployment and integration of the Energy Management System. This deliverable mainly refers to Task 4.2.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Most appropriate DR services for each pilot

Report describing the most appropriate Demand Response (DR) services for each pilot based on an assessment of the grid issues faced by each of the three islands and the consideration of the specific DR assets implemented at each pilot site. The report will include a description of the algorithms developed for determining curtailment and DR. This deliverable mainly refers to Task 5.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Report on selected evaluation indicators

Report describing the selected key indicators for the environmental and economic assessment of the technical solutions and providing the value thresholds set for each indicator so to assess positive or negative impacts. This deliverable mainly refers to Task 6.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Data collection, modeling, simulation and decision

Report describing all steps necessary before the deployment of the storage technologies in the selected micro-production sites, namely data collection, modeling, simulation and decision. This deliverable mainly refers to Task 4.3.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Reference energy simulation models for the three pilot islands

Report describing the established reference energy simulation models of the energy system for the three pilots for modelling a year with a temporal resolution of 1h. This reference will holistically describe the present energy systems including electricity, heating, cooling, transportation and industrial needs with a particular focus on parts of the systems that are interconnected through conversion units between these (e.g. electricity to heat or electricity to transportation). This deliverable mainly refers to Task 8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Detailed plan of action for the DSM demo

Report detailing the plan of action for the deployment of the DSM system as part of the Madeira pilot installation. This deliverable mainly refers to Task 4.4. This report may also include information that complete the previous deliverables.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Detailed plan of action for the EV smart charging demo

Report detailing the plan of action for the deployment of the EV smart charging system as part of the Madeira pilot installation. This deliverable mainly refers to Task 4.7. This report may also include information that complete the previous deliverables.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Design specification for Orkney DSM system

Detailed design of the DSM system to be installed on Orkney. This deliverable mainly refers to Task 2.4

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-04-15

SMILE website up and running & Social Media presence

SMILE website up and running. Start of Social Media presence, which will be regularly updated throughout the project. This deliverable mainly refers to Task 9.3.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-15

Schematic and technical description of Orkney DSM system architecture

Report describing the overall design concept and architecture of the Orkney Demand Side Management (DSM) system. The report will particularly include a technical description of the DSM system architecture along with schematics. This deliverable mainly refers to Task 2.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Case study specification and assessment

Report describing the overall design concept of the Madeira pilot installation. The report will include the minimum requirements for the installation and demonstration of partner technologies. This deliverable mainly refers to Task 4.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Specifications and data report for the Samsø pilot

Document (in Danish) specifying the overall requirements, construction phases, and technical drawings to manage installers during the installation activity of the Samsø pilot system. The report will particularly include a technical description of the system architecture along with specifications. This deliverable mainly refers to Task 3.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-04-15

Development plan for the SMILE case in Ballen (in Danish, extended summary in English)

Report documenting the final development plan of the Samsø pilot installation. This deliverable mainly refers to Tasks 3.3, 3.4 and 3.5.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-02-12

Medium term scenarios for the three pilot islands

Report describing future scenarios (short term, i.e. up to five years, as well as mid- and long term) which include the demonstration projects in the three pilot islands in the perspective of a shift from energy systems relying on fossil fuels to energy systems relying solely or exclusively on renewable energy sources. This deliverable mainly refers to Task 8.2 as well as Task 8.1, since scenarios take their starting point in the reference models developed in Task 8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-02-12

Kravspecifikation (Requirements Specification) (in Danish, extended summary in English)

Document specifying the overall requirements, construction phases, and technical drawings to manage installers during the installation activity of the Samsø pilot system. This deliverable mainly refers to Tasks 3.3, 3.4 and 3.5.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-02-12

Integrating electricity and heat supply systems

Document (i.e. report or scientific publication) examining the legal concepts applying to heat supply and the integration of the electricity and heat supply systems in DK, PT and the UK and analysing the extent to which a European approach would be required. This deliverable mainly refers to Task 7.2.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-02-12

Regulating Electricity Storage

Document (i.e. report or scientific publication) outlining the outcomes of the assessment of legislation concerning electricity storage along with suggestions for a regulatory framework, which could be envisaged on production/supply or consumer level or on the level of the independent network operator. This deliverable mainly refers to Task 7.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-02-2016

download deliverable 

Documents, reports 2020-02-12