Opendata, web and dolomites

REACH SIGNED

Renewable Energy and Connectivity Hub

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 REACH project word cloud

Explore the words cloud of the REACH project. It provides you a very rough idea of what is the project "REACH" about.

supplies    plan    people    finalise    impedes    deploy    encourage    partnership    hubs    remote    effort    power    while    trl7    transparency    validate    smei    billion    server    regions    18    electricity    connections    accountability    travel    population    buffalogrid    ca    60    deployment    solar    nearly    market    living    education    performed    sahara    central    indicates    commercial    boost    feasibility    sub    designs    enterprise    world    grid    trl9    approximately    stimulate    improvement    camps    hub    communities    environmental    sustainable    belong    700    economic    improvements    africa    operations    minimum    services    health    basic    trial    internet    pcb    mobile    local    phone    risk    2021    establishment    smes    india    worldwide    mainly    km    refugee    off    delivering    enter    entrepreneurship    payment    rural    15    ready    mass    free    exhausting    million    untouched    paved    agents    electronic    mechanism    competitor    commercialization    online    successfully    countries    charged    companies    governance    social   

Project "REACH" data sheet

The following table provides information about the project.

Coordinator
BUFFALOGRID LIMITED 

Organization address
address: 12 JORDAN STREET OFFICE 2
city: LIVERPOOL
postcode: L1 0BP
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.buffalogrid.com
 Total cost 2˙584˙375 €
 EC max contribution 1˙809˙062 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BUFFALOGRID LIMITED UK (LIVERPOOL) coordinator 1˙809˙062.00

Map

 Project objective

While in the developed regions availability of electricity power has paved the way of sustainable development, it is still not available to ca. 18% of the world population, living in rural areas in developing countries and refugee camps worldwide. No access to power indicates exhausting effort for covering basic needs, which impedes sustainable social and economic development. Nearly 700 million people worldwide have mobile phone connections but no access to the electricity. In India, people belong to off-grid communities need to travel approximately 15 km to get their mobile phone charged. We have developed a unique solar power based Hub system and remote payment control mechanism by which electronic devices can be charged under the control of a central server to ensure accountability and transparency. This will enable EU companies to enter in €8 to 10 billion untouched market by delivering essential internet-based services (e.g., e-health, e-education, e-governance etc). BuffaloGrid supplies Hubs free of cost to local agents. This will stimulate local enterprise, encourage entrepreneurship and boost economic development. During SMEi Phase – 1 feasibility study, we have identified several technical improvements that are mainly focused on further development of the Hub, PCB and server designs. For commercial feasibility of the project, we have successfully performed market research, environmental impact assessment, partnership establishment, risk analysis and competitor analysis. During this project, we aim to reach from TRL7 to TRL9 and will make the product ready for mass scale deployment. We will focus on technical design improvement of the Hub for cost reduction (60%) and will finalise optimised system for mass scale production. We will also validate Hub functionality and server operations and will trial online services of EU SMEs in the field. Our commercialization plan is to deploy minimum 50,000 hubs across India, Sub-Sahara Africa and Refugee camps by 2021.

 Deliverables

List of deliverables.
D6.1 Dissemination and communication plan Documents, reports 2020-02-07 16:01:42
D6.2 Brochures and leaflets Documents, reports 2020-02-07 16:01:42
D6.3 Project website Websites, patent fillings, videos etc. 2020-02-07 16:01:46

Take a look to the deliverables list in detail:  detailed list of REACH deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "REACH" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "REACH" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

ARON (2020)

Assay-Ready Organ Network

Read More  

IMPACT (2019)

Improving DNA Analysis for Correct Healthcare

Read More  

Nocturne (2019)

The eye as a window to the brain, extending lifelong brain health

Read More