Explore the words cloud of the FR8RAIL III project. It provides you a very rough idea of what is the project "FR8RAIL III" about.
The following table provides information about the project.
Coordinator |
DEUTSCHE BAHN AG
Organization address contact info |
Coordinator Country | Germany [DE] |
Total cost | 0 € |
EC max contribution | 5˙804˙575 € (0%) |
Programme |
1. H2020-EU.3.4.8.5. (Innovation Programme 5: Technologies for sustainable and attractive European rail freight) |
Code Call | H2020-S2RJU-CFM-2019 |
Funding Scheme | Shift2Rail-IA-LS |
Starting year | 2019 |
Duration (year-month-day) | from 2019-09-01 to 2022-08-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | DEUTSCHE BAHN AG | DE (BERLIN) | coordinator | 2˙202˙150.00 |
2 | TRAFIKVERKET - TRV | SE (BORLANGE) | participant | 1˙028˙342.00 |
3 | BOMBARDIER TRANSPORTATION GMBH | DE (BERLIN) | participant | 551˙070.00 |
4 | Construcciones y Auxiliar de Ferrocarriles, S.A. | ES (Beasain) | participant | 333˙473.00 |
5 | AVL LIST GMBH | AT (GRAZ) | participant | 307˙822.00 |
6 | INDRA SISTEMAS SA | ES (ALCOBENDAS MADRID) | participant | 294˙000.00 |
7 | CONTRAFFIC GMBH | DE (BERLIN) | participant | 292˙010.00 |
8 | ASOCIACION CENTRO TECNOLOGICO CEIT-IK4 | ES (SAN SEBASTIAN) | participant | 188˙827.00 |
9 | HITACHI RAIL STS SPA | IT (GENOVA) | participant | 167˙094.00 |
10 | DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV | DE (KOELN) | participant | 163˙155.00 |
11 | AC2T RESEARCH GMBH | AT (WIENER NEUSTADT) | participant | 150˙207.00 |
12 | FAIVELEY TRANSPORT WITTEN GMBH | DE (WITTEN) | participant | 93˙621.00 |
13 | VIRTUAL VEHICLE RESEARCH GMBH | AT (GRAZ) | participant | 23˙000.00 |
14 | VERBAND DER BAHNINDUSTRIE IN DEUTSCHLAND (VDB) EV | DE (BERLIN) | participant | 9˙800.00 |
The objective of the FR8RAIL III project is to further develop technologies which are relevant for the rail freight sector to reach the goal highlighted in the S2R Strategic Master Plan. The work is partly based on results achieved in the previous projects of the AWP 2015/167 (FFL4E, ARCC, FR8RAIL), the AWP 2017 (FR8HUB) and the AWP 2018 (FR8RAIL II) as well as the relevant open calls.
Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL III further focuses on improving the freight eco system by addressing various challenges in 6 different field:
- Condition based maintenance - Real-time Network Management - Intelligent Video Gate Terminals - Extended Market Wagon - Telematics & Electrification - Freight Loco of the future
Summarizing, FR8RAIL III focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FR8RAIL III" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "FR8RAIL III" are provided by the European Opendata Portal: CORDIS opendata.