Coordinatore | ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 7˙697˙782 € |
EC contributo | 4˙858˙848 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-2010-NMP-ENV-ENERGY-ICT-EeB |
Funding Scheme | CP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-01-01 - 2014-12-31 |
# | ||||
---|---|---|---|---|
1 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
ES (ALCOBENDAS) | coordinator | 0.00 |
2 |
ALINGSASHEM AB
Organization address
address: POBOX 146 contact info |
SE (Alingsas) | participant | 0.00 |
3 |
BASF CONSTRUCTION CHEMICALS GMBH
Organization address
address: Dr.-Albert-Frank-Str. 32 contact info |
DE (Trostberg) | participant | 0.00 |
4 |
BAX & WILLEMS
Organization address
address: Calle Roger de LLuria 120 principal contact info |
ES (BARCELONA) | participant | 0.00 |
5 |
Dura Vermeer Groep NV
Organization address
address: Orfeoschouw 30 contact info |
NL (Zoetermeer) | participant | 0.00 |
6 |
EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH
Organization address
address: Raemistrasse 101 contact info |
CH (ZUERICH) | participant | 0.00 |
7 |
ENECO BV
Organization address
address: WILHELMINAKADE 955 contact info |
NL (ROTTERDAM) | participant | 0.00 |
8 |
ICF NOVEDIS SA
Organization address
city: PARIS contact info |
FR (PARIS) | participant | 0.00 |
9 |
INSTITUTO TECNOLOGICO DE ARAGON
Organization address
address: MARIA DE LUNA 8 contact info |
ES (ZARAGOZA) | participant | 0.00 |
10 |
ISA - Intelligent Sensing Anywhere S.A.
Organization address
address: Rua D. Manuel I 92 contact info |
PT (Coimbra) | participant | 0.00 |
11 |
LUWOGE consult GmbH
Organization address
address: Donnersbergweg contact info |
DE (Ludwigshafen) | participant | 0.00 |
12 |
MAC PUAR SA
Organization address
address: LEONARDO DA VINCO PARCELA TA contact info |
ES (SEVILLA) | participant | 0.00 |
13 |
NOBATEK
Organization address
address: Rue de Mirambeau 67 contact info |
FR (Anglet) | participant | 0.00 |
14 |
Siemens Schweiz AG
Organization address
address: ALBISRIEDERSTRASSE 245 contact info |
CH (ZURICH) | participant | 0.00 |
15 |
SKANSKA SVERIGE AB
Organization address
address: Rasundavagen contact info |
SE (SOLNA) | participant | 0.00 |
16 |
SOLINTEL M&P SL
Organization address
address: Avenida de Jerez 33 contact info |
ES (Nuevo Baztan) | participant | 0.00 |
17 |
SP SVERIGES TEKNISKA FORSKNINGSINSTITUT AB
Organization address
address: BRINELLGATAN 4 contact info |
SE (BORAS) | participant | 0.00 |
18 |
STICHTING WOONBRON
Organization address
address: WEENA contact info |
NL (ROTTERDAM) | participant | 0.00 |
19 |
TECHNISCHE UNIVERSITEIT DELFT
Organization address
address: Stevinweg 1 contact info |
NL (DELFT) | participant | 0.00 |
20 |
UNIVERSITEIT MAASTRICHT
Organization address
address: Minderbroedersberg 4-6 contact info |
NL (MAASTRICHT) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
BEEM-UP will demonstrate the economic, social and technical feasibility of retrofitting initiatives, drastically reducing the energy consumption in existing buildings, and lay the ground for massive market uptake. BEEM-UP involves the building owners at 3 sites in France, Sweden and the Netherlands to implement an innovative approach to go beyond a 75% reduction in space heat energy consumption, in addition to reducing the total energy consumption. Ambitious energy reduction will be demonstrated as the economically most attractive alternative for retrofitting.
In integrated design the building owners, industry, designers and energy experts collaborate around the building to reach a higher performance and be more adapted to the tenant needs than if just plugging in separate solutions are used. New concepts will be identified that can be replicated in further retrofit projects.
An ambitious monitoring programme to demonstrate the reduction in energy consumption will accompany the whole process, including a period of at least two years after the retrofit. This technical monitoring will be complemented with a social monitoring, focusing on the acceptance of the occupant.
A whole programme is designated to involve the occupants in the retrofit. ICT systems (smart metering and building control) will encourage and support energy savings.
The main challenge is to turn energy reduction in existing buildings into standard option on the market. Going beyond pure demonstration, BEEM-UP will be develop and exploitation plan based on green value, actively disseminate across Europe, and interact with stakeholders, to create a solid demand for energy reductions by building owners, and make BEEM-UP a model for future retrofits. Before 2020, all retrofit projects in Europe will target ambitious energy reductions: not because it is “compulsory and good”, but because it is the most attractive alternative.