Coordinatore | INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 13˙682˙891 € |
EC contributo | 8˙800˙000 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2013-NMP-ENV-EeB |
Funding Scheme | CP-TP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-07-01 - 2017-06-30 |
# | ||||
---|---|---|---|---|
1 |
INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
UK (GLASGOW) | coordinator | 690˙120.00 |
2 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
ES (DONOSTIA-SAN SEBASTIAN) | participant | 674˙168.00 |
3 |
COVENTRY UNIVERSITY
Organization address
address: PRIORY STREET contact info |
UK (COVENTRY) | participant | 584˙940.00 |
4 |
VERTECH GROUP SARL
Organization address
city: NICE contact info |
FR (NICE) | participant | 492˙220.00 |
5 |
CONSORCI SANITARI DE TERRASSA
Organization address
address: CARRETERA DE TORREBONICA s/n contact info |
ES (Terrassa) | participant | 491˙312.00 |
6 |
CORPORACIO SANITARIA PARC TAULI DE SABADELL
Organization address
address: PARC TAULI S/N contact info |
ES (SABADELL) | participant | 484˙437.00 |
7 |
SKELLEFTEA KOMMUN
Organization address
address: Tradgardsgatan 6 contact info |
SE (SKELLEFTEA) | participant | 480˙380.00 |
8 |
EXERGY LTD
Organization address
address: PUMA WAY THE TECHNOCENTRE COVENTRY contact info |
UK (Coventry) | participant | 478˙880.00 |
9 |
APPLIED INDUSTRIAL TECHNOLOGIES LTD
Organization address
address: ODOS SOULIOU 1 & KALAVRITON contact info |
EL (Gerakas) | participant | 453˙400.00 |
10 |
UNIVERSITAT POLITECNICA DE CATALUNYA
Organization address
address: Jordi Girona 31 contact info |
ES (BARCELONA) | participant | 422˙085.00 |
11 |
ACONDICIONAMIENTO TARRASENSE ASSOCIACION
Organization address
address: CARRER DE LA INNOVACIO 2 contact info |
ES (TERRASSA) | participant | 349˙068.00 |
12 |
EIDGENOESSISCHE MATERIALPRUEFUNGS- UND FORSCHUNGSANSTALT
Organization address
address: Ueberlandstrasse 129 contact info |
CH (DUEBENDORF) | participant | 339˙981.00 |
13 |
NOBATEK
Organization address
address: Rue de Mirambeau 67 contact info |
FR (Anglet) | participant | 330˙526.00 |
14 |
VA-Q-TEC AG
Organization address
address: KARL FERDINAND BRAUNSTRASSE 7 contact info |
DE (WURZBURG) | participant | 299˙917.00 |
15 |
OBRASCON HUARTE LAIN SA
Organization address
address: "PASEO DE LA CASTELLANA 259 PORTAL D, TORRE ESPACIO" contact info |
ES (MADRID) | participant | 295˙344.00 |
16 |
INCURVO S.L.U.
Organization address
address: Paseo Maritimo 84 contact info |
ES (Barcelona) | participant | 292˙661.00 |
17 |
CENTRE CIM FUNDACIO PRIVADA
Organization address
address: Carrer Llorens i Artigas 12 contact info |
ES (Barcelona) | participant | 255˙684.00 |
18 |
SEPAREX SAS
Organization address
address: RUE JACQUES MONOD 5 contact info |
FR (CHAMPIGNEULLES) | participant | 250˙645.00 |
19 |
ONEXIT IDATEC SL
Organization address
address: AVENIDA ALTOS HORNOS DE VIZCAYA 33 contact info |
ES (BARACALDO) | participant | 248˙800.00 |
20 |
PHASE CHANGE MATERIAL PRODUCTS LTD
Organization address
address: MERE VIEW INDUSTRIAL ESTATE UNIT contact info |
UK (PETERBOROUGH CAMBS) | participant | 209˙046.00 |
21 |
FUNDACIO EURECAT
Organization address
address: AVENIDA UNIVERSITAT AUTONOMA 23 contact info |
ES (CERDANYOLA DEL VALLES (BARCELONA)) | participant | 188˙306.00 |
22 |
CONSORZIO INTERUNIVERSITARIO NAZIONALE PER LA SCIENZA E TECNOLOGIA DEI MATERIALI
Organization address
address: Via Giusti 9 contact info |
IT (FIRENZE) | participant | 184˙928.00 |
23 |
TECHNISCHE UNIVERSITAET WIEN
Organization address
address: Karlsplatz 13 contact info |
AT (WIEN) | participant | 175˙936.00 |
24 |
SOCIETE ANONYME D'HABITATIONS A LOYER MODERE LOGEMENT ET GESTION IMMOBILIERE POUR LA REGION PARISIENNE-LOGIREP
Organization address
address: RUE GAMBETTA 127 contact info |
FR (SURESNES) | participant | 65˙712.00 |
25 |
JAVNI ZAVOD REPUBLIKE SLOVENIJE ZA VARSTVO KULTURNE DEDISCINE
Organization address
address: METELKOVA ULICA 6 contact info |
SI (LJUBLJANA) | participant | 61˙504.00 |
26 |
FUNDACIO PRIVADA ASCAMM
Organization address
address: "AVENIDA UNIVERSITAT AUTONOMA , PARC TECNOLOGIC DEL VALLES 23" contact info |
ES (CERDANYOLA DEL VALLES) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'RESEEPE will bring together design and decision making tools, innovative building fabric manufacturers and a strong demonstration programme to demonstrate the improved building performance through retrofitting. The core idea of the RESSEEPE project is to technically advance, adapt, demonstrate and assess a number of innovative retrofit technologies. Reductions in the area of 50% will be achieved in terms of energy consumption .A systemic process will be also implemented that will allow the selection of the best possible retrofiting mix, customised to the needs of the particular building..
Several remarkable innovative technologies and materials will be integrated in the retrofitting process: - Envelope Retrofitting: Ventilated Facades, Aerogel-based Superinsulating mortar, Wooden Insulating Wall Panel and VIP Panel - Integration of RES: PV Energy, Thermal Collectors - Energy Storage Systems: Thermal storage and PCMs - Nanotechnologies and smart materials: EC/PV Windows - ICT: Strategies at building and district level - Intelligent Building Controls: HVAC systems
The RESSEEPE framework will be validated and refined by a strong demonstration programme, envisaging the renovation of 102.000 square meters of public buildings, arriving to a total renovation of 205.000 square meters that will be deployed in the following years. The estimated average of energy consumption in the renovated demo sites, on final energy, will be 66 kWh/m2•year, representing a 63% of reduction in energy consumption compared to the current situation. CO2 emissions will be 48,15 kg/m2•year, corresponding to more than 60 % of reduction. The total emissions avoided by the demo sites will be 2257 tCO2/year.
Associated investment costs to building renovation are expected to represent a maximum of 19% on average of the total costs of building an equivalent new building in the same location. On average, the return on investment will be around 7,6 years.'
"A web-based repository of nanoscience and nanotechnology publications, database of researchers and online forum, to inform and facilitate networking between EU and ICPC RTD"
Read More