Coordinatore | EPSCO s.r.l.
Organization address
address: VIALE LOMBARDIA 12 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 1˙322˙991 € |
EC contributo | 984˙174 € |
Programma | FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs |
Code Call | FP7-SME-2010-1 |
Funding Scheme | BSG-SME |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-01-01 - 2012-12-31 |
# | ||||
---|---|---|---|---|
1 |
EPSCO s.r.l.
Organization address
address: VIALE LOMBARDIA 12 contact info |
IT (MILANO) | coordinator | 286˙448.40 |
2 |
ARGUS REMOTE SYSTEMS AS
Organization address
address: NYGARDSVIKEN 1 contact info |
NO (LAKSEVAG) | participant | 198˙034.00 |
3 |
GREENBANK TEROTECH LTD
Organization address
address: HARTSHORNE ROAD contact info |
UK (DERBY) | participant | 193˙066.00 |
4 |
HRS HEAT EXCHANGERS SLU
Organization address
address: CALLE CASTILLO DE LA CONCEPCION (POLIG IND SAN MARTIN) NAVE 6 contact info |
ES (LORQUI MURCIA) | participant | 146˙030.00 |
5 |
EMERGO d.o.o.
Organization address
address: II VRANDUCKA 4 contact info |
HR (ZAGREB) | participant | 113˙360.00 |
6 |
THE UK MATERIALS TECHNOLOGY RESEARCH INSTITUTE LIMITED
Organization address
address: MIDDLE ASTON HOUSE contact info |
UK (MIDDLE ASTON OXFORDSHIRE) | participant | 17˙345.00 |
7 |
TURBODEN SRL
Organization address
address: VIA CERNAIA 10 contact info |
IT (BRESCIA) | participant | 11˙893.00 |
8 |
"NASICECEMENT TVORNICA CEMENTA, DIONICKO DRUSTVO"
Organization address
address: Tajnovac 1 contact info |
HR (NASICE OSIJEK) | participant | 9˙253.00 |
9 |
NOVAMINA CENTAR INOVATIVNIH TEHNOLOGIJA DOO
Organization address
address: JACKOVINSLI KLANEC 17 contact info |
HR (Zagreb) | participant | 8˙745.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The strategic overall objective of the project is to develop a Waste Heat Recovery system for Power Generation in Cement plants. Waste Heat Recovery system (WHRS) will be based on ORC process, primarily attached to the cement production plant clinker cooler with definitive purpose to produce electrical energy from Low Temperature Waste Heat sources, as clinker exhaust heat is. Specific technological challenge for this project is to develop a Waste Energy Recovery Boiler (WERB) that will be able to operate efficiently in the highly demanding and aggressive conditions of clinker cooler exhaust gases area. High dust content and abrasiveness of clinker exhaust gas presents very demanding environment for reliable WERB operation. Integration of developed WERB system in existing Clinker Cooler process line and interface with ORC 1.5MWe plant in overall WHRS unit is next technology challenge. During the time span of this project following innovative solutions will be developed and implemented: • Waste Energy Recovery Boiler WERB pipes protective coating development • (WERB) design and optimization • Advanced Control And Guidance System • Integration and Optimization of WHRS Cement plant system'
A Novel System for the Production of World's First Micro Ball Grid Array (µBGA) Spheres for enabling the EU Electronics Industry to produce smaller electronics goods
Read MoreThe development of a modular ‘stepping locomotion’ system for installation on subsea trenching machines used for subsea energy cable burial
Read More"Innovative simulation tool for bone and bone biomaterials, based on enhanced CT-data exploitation"
Read More