HEATPOWER

Waste Heat Power Generation in Cement Plant

 Coordinatore EPSCO s.r.l. 

 Organization address address: VIALE LOMBARDIA 12
city: MILANO
postcode: 20131

contact info
Titolo: Mr.
Nome: Ivan
Cognome: Benja
Email: send email
Telefono: +39 02 5518 2205
Fax: +39 2 55182470

 Nazionalità Coordinatore Italy [IT]
 Totale costo 1˙322˙991 €
 EC contributo 984˙174 €
 Programma FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs
 Code Call FP7-SME-2010-1
 Funding Scheme BSG-SME
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-01-01   -   2012-12-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    EPSCO s.r.l.

 Organization address address: VIALE LOMBARDIA 12
city: MILANO
postcode: 20131

contact info
Titolo: Mr.
Nome: Ivan
Cognome: Benja
Email: send email
Telefono: +39 02 5518 2205
Fax: +39 2 55182470

IT (MILANO) coordinator 286˙448.40
2    ARGUS REMOTE SYSTEMS AS

 Organization address address: NYGARDSVIKEN 1
city: LAKSEVAG
postcode: 5165

contact info
Titolo: Mr.
Nome: Frode
Cognome: Korneliussen
Email: send email
Telefono: +47 56113050
Fax: +47 56113060

NO (LAKSEVAG) participant 198˙034.00
3    GREENBANK TEROTECH LTD

 Organization address address: HARTSHORNE ROAD
city: DERBY
postcode: DE11 7GT

contact info
Titolo: Mr.
Nome: Peter
Cognome: Cobham
Email: send email
Telefono: +44845 0707 097
Fax: +44845 0707 098

UK (DERBY) participant 193˙066.00
4    HRS HEAT EXCHANGERS SLU

 Organization address address: CALLE CASTILLO DE LA CONCEPCION (POLIG IND SAN MARTIN) NAVE 6
city: LORQUI MURCIA
postcode: 30564

contact info
Titolo: Mr.
Nome: Francisco Javier
Cognome: Abad Ruiz
Email: send email
Telefono: +34 968676157
Fax: +34 968676166

ES (LORQUI MURCIA) participant 146˙030.00
5    EMERGO d.o.o.

 Organization address address: II VRANDUCKA 4
city: ZAGREB
postcode: 10000

contact info
Titolo: Ms.
Nome: Odet
Cognome: Cvek
Email: send email
Telefono: +385 1 364 9300
Fax: +385 1 364 9302

HR (ZAGREB) participant 113˙360.00
6    THE UK MATERIALS TECHNOLOGY RESEARCH INSTITUTE LIMITED

 Organization address address: MIDDLE ASTON HOUSE
city: MIDDLE ASTON OXFORDSHIRE
postcode: OX25 5PT

contact info
Titolo: Mrs.
Nome: Marie
Cognome: Cook
Email: send email
Telefono: +44 1664 501 509
Fax: +44 1664 501 589

UK (MIDDLE ASTON OXFORDSHIRE) participant 17˙345.00
7    TURBODEN SRL

 Organization address address: VIA CERNAIA 10
city: BRESCIA
postcode: 25100

contact info
Titolo: Mr.
Nome: Marco
Cognome: Baresi
Email: send email
Telefono: +39 030 3552001
Fax: +39 030 3552 011

IT (BRESCIA) participant 11˙893.00
8    "NASICECEMENT TVORNICA CEMENTA, DIONICKO DRUSTVO"

 Organization address address: Tajnovac 1
city: NASICE OSIJEK
postcode: 31500

contact info
Titolo: Mr.
Nome: željko
Cognome: Zebi?
Email: send email
Telefono: +385 31 227 372
Fax: +385 31 613 772

HR (NASICE OSIJEK) participant 9˙253.00
9    NOVAMINA CENTAR INOVATIVNIH TEHNOLOGIJA DOO

 Organization address address: JACKOVINSLI KLANEC 17
city: Zagreb
postcode: 10000

contact info
Titolo: Ms.
Nome: Jasmina
Cognome: Petrinovic
Email: send email
Telefono: +385 1 3499 836
Fax: +385 1 3793 345

HR (Zagreb) participant 8˙745.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

optimization    boiler    energy    cooler    plant    heat    recovery    werb    integration    cement    clinker    whrs    waste    exhaust    orc    demanding   

 Obiettivo del progetto (Objective)

'The strategic overall objective of the project is to develop a Waste Heat Recovery system for Power Generation in Cement plants. Waste Heat Recovery system (WHRS) will be based on ORC process, primarily attached to the cement production plant clinker cooler with definitive purpose to produce electrical energy from Low Temperature Waste Heat sources, as clinker exhaust heat is. Specific technological challenge for this project is to develop a Waste Energy Recovery Boiler (WERB) that will be able to operate efficiently in the highly demanding and aggressive conditions of clinker cooler exhaust gases area. High dust content and abrasiveness of clinker exhaust gas presents very demanding environment for reliable WERB operation. Integration of developed WERB system in existing Clinker Cooler process line and interface with ORC 1.5MWe plant in overall WHRS unit is next technology challenge. During the time span of this project following innovative solutions will be developed and implemented: • Waste Energy Recovery Boiler WERB pipes protective coating development • (WERB) design and optimization • Advanced Control And Guidance System • Integration and Optimization of WHRS Cement plant system'

Altri progetti dello stesso programma (FP7-SME)

µBGAS (2010)

A Novel System for the Production of World's First Micro Ball Grid Array (µBGA) Spheres for enabling the EU Electronics Industry to produce smaller electronics goods

Read More  

HEXATERRA (2013)

The development of a modular ‘stepping locomotion’ system for installation on subsea trenching machines used for subsea energy cable burial

Read More  

BIO-CT-EXPLOIT (2009)

"Innovative simulation tool for bone and bone biomaterials, based on enhanced CT-data exploitation"

Read More