Coordinatore | CENTRUM VYZKUMU REZ S.R.O.
Organization address
address: HUSINEC-REZ 130 contact info |
Nazionalità Coordinatore | Czech Republic [CZ] |
Totale costo | 2˙830˙750 € |
EC contributo | 1˙500˙000 € |
Programma | FP7-EURATOM-FISSION
EURATOM: Nuclear fission and radiation protection |
Code Call | FP7-Fission-2010 |
Funding Scheme | CP-FP |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-01-01 - 2014-12-31 |
# | ||||
---|---|---|---|---|
1 |
CENTRUM VYZKUMU REZ S.R.O.
Organization address
address: HUSINEC-REZ 130 contact info |
CZ (HUSINEC-REZ) | coordinator | 471˙000.00 |
2 |
Karlsruher Institut fuer Technologie
Organization address
address: Kaiserstrasse 12 contact info |
DE (Karlsruhe) | participant | 376˙000.00 |
3 |
NUCLEAR RESEARCH AND CONSULTANCY GROUP
Organization address
address: Westerduinweg 3 contact info |
NL (PETTEN) | participant | 223˙000.00 |
4 |
Teknologian tutkimuskeskus VTT Oy
Organization address
address: Vuorimiehentie 3 contact info |
FI (Espoo) | participant | 203˙000.00 |
5 |
JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION
Organization address
address: Rue de la Loi 200 contact info |
BE (BRUSSELS) | participant | 117˙000.00 |
6 |
MAGYAR TUDOMANYOS AKADEMIA KFKI ATOMENERGIA KUTATOINTEZET
Organization address
address: KONKOLY THEGE MIKLOS UT 29-33 contact info |
HU (BUDAPEST) | participant | 70˙600.00 |
7 |
BUDAPESTI MUSZAKI ES GAZDASAGTUDOMANYI EGYETEM
Organization address
address: MUEGYETEM RAKPART 3 contact info |
HU (BUDAPEST) | participant | 39˙400.00 |
8 |
SIEMENS AKTIENGESELLSCHAFT
Organization address
address: Wittelsbacherplatz 2 contact info |
DE (MUNCHEN) | participant | 0.00 |
9 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR-15 research reactor in Czech Republic in the future. All necessary documents required for licensing of the FQT facility by the Czech regulator shall be the outcome of this project. Pre-qualification of the FQT facility will be carried out in China. Testing of a limited amount of commercially available nuclear grade materials, which are candidates for fuel cladding, will be carried out within this project as well. The European-Chinese team behind this project has been formed during a meeting held in Rez, Czech Republic, in October 2009; the wider EU-China scientific collaboration, together with its legal aspects, has been discussed during the seminar held in Beijing in March, 2010.'
EU-funded scientists are unveiling an experimental facility to carry out a fuel qualification test (FQT) for their next-generation reactors.