Coordinatore | UNIVERSITAET BASEL
Organization address
address: Petersplatz 1 contact info |
Nazionalità Coordinatore | Switzerland [CH] |
Totale costo | 1˙310˙234 € |
EC contributo | 980˙278 € |
Programma | FP7-ENVIRONMENT
Specific Programme "Cooperation": Environment (including Climate Change) |
Code Call | FP7-ENV-2011 |
Funding Scheme | CSA-CA |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-10-01 - 2014-09-30 |
# | ||||
---|---|---|---|---|
1 |
UNIVERSITAET BASEL
Organization address
address: Petersplatz 1 contact info |
CH (BASEL) | coordinator | 217˙871.80 |
2 |
ELECTRICITE DE FRANCE S.A.
Organization address
address: avenue de Wagram 22-30 contact info |
FR (PARIS) | participant | 136˙185.00 |
3 |
AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS
Organization address
address: CALLE SERRANO 117 contact info |
ES (MADRID) | participant | 127˙937.76 |
4 |
UNIVERSITA CATTOLICA DEL SACRO CUORE
Organization address
address: Largo Agostino Gemelli 1 contact info |
IT (MILANO) | participant | 125˙054.00 |
5 |
INSTITUT NATIONAL DE L ENVIRONNEMENT ET DES RISQUES INERIS
Organization address
address: Parc Technologique Alata contact info |
FR (VERNEUIL EN HALATTE) | participant | 108˙512.00 |
6 |
HELMHOLTZ-ZENTRUM FUER UMWELTFORSCHUNG GMBH - UFZ
Organization address
address: Permoser Strasse 15 contact info |
DE (LEIPZIG) | participant | 94˙096.00 |
7 |
THE SECRETARY OF STATE FOR ENVIRONMENT, FOOD AND RURAL AFFAIRS
Organization address
address: Area 1A, Nobel House, Smith Square 17 contact info |
UK (LONDON) | participant | 73˙048.00 |
8 |
BENAKI PHYTOPATHOLOGICAL INSTITUTE
Organization address
address: Stefanou Delta street 8 contact info |
EL (ATHINA) | participant | 54˙153.00 |
9 |
FAUST UND BACKHAUS ENVIRONMENTAL CONSULTING GBR
Organization address
address: FAHRENHEITSTRASSE 1 contact info |
DE (BREMEN) | participant | 43˙421.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Today, human risk assessment and environmental risk assessment are typically separated. Existing risk assessment (RA) experience and regulations are challenged by future RA needs. - There is a lack of mutual understanding between subject matter experts of individual disciplines. - Data from toxicological and ecotoxicological studies is not readily accessible by risk assessors across disciplines. - The need for RA will continue to increase (e.g. REACH or toxicity of mixtures) along with budget restrictions and political and public pressure to reduce the number of animal tests. Therefore, more cost effective, predictive and rapid tests for high quality sustainable RA are needed including a better exploitation of existing data. - More transparency in RA is needed to allow better risk communication to regain consumer/public trust and to give unambiguous guidance for improved risk management. - Scientific RA plays an increasing role internationally for global risk governance and as a tool to support sustainable trade practices. Divergence often arises on risk policies and measures, sometimes due to different RA approaches. Therefore, stronger international co-operation in this area is needed. Against this background, the overall objective of the proposed coordination action HEROIC is to establish and co-ordinate a global network of European and international experts and stakeholders from different disciplines to establish stronger interfaces between human and environmental RA, between RA and risk management, between the various agencies and countries within the EU and between agencies and industry. To this end, the HEROIC consortium members will make full use of their own extensive networks to involve stakeholders and experts in workshops, roundtables and outreach activities. These coordinating activities will result in enhanced sharing of knowledge, building consensus and development of clear, easily understood, transparent and unambiguous integrated RA procedures.'
An EU-funded project has shown a way forward to uniting the separate disciplines of human health and environmental risk assessment into an integrated risk assessment (IRA) approach.