Horizon2020 projects coordinated by "THALES LAS FRANCE SAS"
# |
project acronym |
year |
total cost |
totalcontribution |
1 |
PJ16 CWP HMI Controller Working Position / Human Machine Interface - CWP/HMI |
2016 |
21˙252˙138.00 |
12˙628˙761.00 |
2 |
PJ17 SWIM-TI SWIM Technical Infrastructure |
2016 |
16˙221˙751.00 |
9˙033˙141.00 |
3 |
USIS U-Space Initial Services |
2018 |
1˙799˙323.00 |
1˙308˙671.00 |
More Horizon 2020 projects
The Institution THALES LAS FRANCE SAS has been involved also in the following Horizon 2020 projects.
- FUTURE SKY SAFETY (2015, participant)
- EXIST (2015, participant)
- PJ07 OAUO (2016, participant)
- PJ22 SEABIRD (2016, participant)
- PJ09 DCB (2016, participant)
- PJ08 AAM (2016, participant)
- PJ01 EAD (2016, participant)
- PJ11 CAPITO (2016, participant)
- PJ24 NCM (2016, participant)
- PJ20 AMPLE (2016, participant)
- PJ06 TOBEFREE (2016, participant)
- PJ03B SAFE (2016, participant)
- PJ15 COSER (2016, participant)
- PJ10 PROSA (2016, participant)
- PJ05 REMOTE TOWER (2016, participant)
- PJ18 4DTM (2016, participant)
- PJ19 CI (2016, participant)
- PJ14 EECNS (2016, participant)
- PJ02 EARTH (2016, participant)
- PJ04 TAM (2016, participant)
- PJ03A SUMO (2016, participant)
- PJ27 IOPVLD (2016, participant)
- PJ18-W2 4D SKYWAYS (2019, participant)
- PJ07-W2 OAUO (2019, participant)
- PJ01-W2 EAD (2019, participant)
- PJ05-W2 DTT (2019, participant)
- PJ13 - W2 ERICA (2019, participant)
- PJ10-W2 PROSA (2019, participant)
- PJ14-W2 I-CNSS (2019, participant)
- PJ02-W2 AART (2019, participant)
- PJ20-W2 AMPLE (2019, participant)
- PJ19-W2 CI (2019, participant)
- PJ09-W2 DNMS (2019, participant)