Opendata, web and dolomites

PJ19 CI SIGNED

Content Integration

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "PJ19 CI" data sheet

The following table provides information about the project.

Coordinator
EUROCONTROL - EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION 

Organization address
address: Rue de la Fusée 96
city: BRUXELLES
postcode: 1130
website: www.eurocontrol.int

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Belgium [BE]
 Project website http://www.eatmportal.eu
 Total cost 25˙145˙687 €
 EC max contribution 6˙849˙142 € (27%)
 Programme 1. H2020-EU.3.4.7. (SESAR JU)
 Code Call H2020-SESAR-2015-2
 Funding Scheme SESAR-CSA
 Starting year 2016
 Duration (year-month-day) from 2016-11-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EUROCONTROL - EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION BE (BRUXELLES) coordinator 0.00
2    DFS DEUTSCHE FLUGSICHERUNG GMBH DE (LANGEN) participant 1˙131˙963.00
3    NATS (EN ROUTE) PUBLIC LIMITED COMPANY UK (FAREHAM) participant 822˙500.00
4    AIRBUS FR (BLAGNAC) participant 714˙950.00
5    ENAV SPA IT (ROMA) participant 630˙000.00
6    ENAIRE ES (MADRID) participant 599˙342.00
7    THALES LAS FRANCE SAS FR (ELANCOURT) participant 540˙999.00
8    SINTEF AS NO (TRONDHEIM) participant 370˙572.00
9    LEONARDO - SOCIETA PER AZIONI IT (ROMA) participant 358˙419.00
10    INDRA SISTEMAS SA ES (ALCOBENDAS MADRID) participant 354˙900.00
11    LUFTFARTSVERKET SE (NORRKOPING) participant 330˙749.00
12    FREQUENTIS AG AT (WIEN) participant 162˙499.00
13    SKYGUIDE, SA SUISSE POUR LES SERVICES DE LA NAVIGATION AERIENNE CIVILS ET MILITAIRES CH (GENEVA) participant 154˙000.00
14    STIFTELSEN SINTEF NO (TRONDHEIM) participant 149˙427.00
15    ATOS BELGIUM BE (ZAVENTEM) participant 129˙999.00
16    DIRECTION DES SERVICES DE LA NAVIGATION AERIENNE FR (PARIS) participant 116˙900.00
17    DASSAULT AVIATION FR (PARIS) participant 102˙191.00
18    VALSTYBES IMONE ORO NAVIGACIJA LT (VILNIAUS) participant 68˙392.00
19    NAVIAIR DK (KASTRUP) participant 57˙812.00
20    AUSTRO CONTROL OSTERREICHISCHE GESELLSCHAFT FUR ZIVILLUFTFAHRT MBH AT (WIEN) participant 28˙112.00
21    CROATIA CONTROL, CROATIAN AIR NAVIGATION SERVICES LTD HR (VELIKA GORICA) participant 25˙410.00
22    AIRTEL ATN LIMITED IE (DUN LOAGHAIRE DUBLIN) participant 0.00
23    HUNGAROCONTROL MAGYAR LEGIFORGALMISZOLGALAT ZARTKORUEN MUKODO RESZVENYTARSASAG HU (BUDAPEST) participant 0.00
24    LETOVE PREVADZKOVE SLUZBY SLOVENSKEJ REPUBLIKY, STATNY PODNIK SK (BRATISLAVA) participant 0.00
25    POLSKA AGENCJA ZEGLUGI POWIETRZNEJ PL (WARSZAWA) participant 0.00
26    RIZENI LETOVEHO PROVOZU CESKE REPUBLIKY STATNI PODNIK CZ (JENEC) participant 0.00
27    SAAB AKTIEBOLAG SE (LINKOPING) participant 0.00
28    UDARAS EITLIOCHTA NA HEIREANN THE IRISH AVIATION AUTHORITY IE (DUBLIN) participant 0.00

Map

 Project objective

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – the SESAR 2020 Concept of Operations, the High Level Architecture options, Services and the associated performance results. In SESAR2020 this important task will be under the responsibility of PJ19 – Content Integration. The other main task of the PJ19 will be to provide steering guidance, principles and frameworks to support and facilitate the production and the integration of the content produced by SESAR2020 Solution and Enabling projects. It will enable the assessment of the overall performance of the SESAR Solutions brought together against the performance improvements expectations. It will provide the main input for the future updates of the European ATM Master Plan. PJ19 will bring together 16 partners. The broad representation of experts from the European Air Navigation Service Providers, Airports, Airborne and Ground industries and Network Manager will provide the necessary skills to successfully and efficiently carry out the project tasks and to meet the expectations of the SJU. PJ19 will produce a set of deliverables that consolidate the SESAR2020 Programme outcomes and provide an integrated reference material on a yearly basis. All these tasks will be performed in collaboration with all SESAR 2020 projects throughout an interactive, continuous and iterative process on all aspects of content integration. PJ19 deliverables will support the SJU to assess the maturity of the SESAR Solutions for delivery to the SESAR Deployment Manager, to monitor the SESAR2020 Programme execution and to support the SJU decision making.

 Deliverables

List of deliverables.
PJ19: VALS (2019) Documents, reports 2020-03-11 15:21:35
PJ19: EATMA release note (2019) Documents, reports 2020-03-11 15:21:35
PJ19: EATMA guidance material (2019) Documents, reports 2020-03-11 15:21:35
PJ19: RSIT (2018) Documents, reports 2020-03-11 15:21:35
PJ19: Performance Framework (2018) Documents, reports 2020-03-11 15:21:35
PJ19: EATMA guidance material (2018) Documents, reports 2020-03-11 15:21:35
PJ19: EATMA release note (2018) Documents, reports 2020-03-11 15:21:35
PJ19: ADD (2018) Documents, reports 2020-03-11 15:21:35
PJ19: CONOPS (2018) Documents, reports 2020-03-11 15:21:35
PJ19: Validation Targets (2019) Documents, reports 2020-03-11 15:21:35
PJ19: VALS (2018) Documents, reports 2020-03-11 15:21:35
PJ19: Validation Targets (2018) Documents, reports 2020-03-11 15:21:35
PJ19: EATMA guidance material and report (2017) Documents, reports 2020-03-11 15:21:35
PJ19: Yearly Lifecycle Reference Material (2017) Documents, reports 2020-03-11 15:21:34
PJ19: Update to SESAR Lexicon (2017) Documents, reports 2020-03-11 15:21:35
PJ19: Validation Targets (2017) Documents, reports 2020-03-11 15:21:34
PJ19: EATMA guidance material and report (2016) Documents, reports 2020-03-11 15:21:34
PJ19: EATMA Portal and model release notes (2017) Documents, reports 2020-03-11 15:21:35
PJ19: CONOPS (2017) Documents, reports 2020-03-11 15:21:35
PJ19: ADD (2017) Documents, reports 2020-03-11 15:21:35
PJ19: Performance Framework (2017) Documents, reports 2020-03-11 15:21:35
PJ19: AIRM (2017) Documents, reports 2020-03-11 15:21:35
PJ19: ISRM (2017) Documents, reports 2020-03-11 15:21:35
PJ19: Integrated Roadmap Data Set (2017) Documents, reports 2020-03-11 15:21:34
PJ19: ADD (2019) Documents, reports 2020-01-14 14:33:15
PJ19: CONOPS (2019) Documents, reports 2020-01-14 15:15:16
PJ19: RSIT (2019) Documents, reports 2020-01-14 14:37:51
PJ19: Performance Framework (2019) Documents, reports 2020-01-14 15:14:20

Take a look to the deliverables list in detail:  detailed list of PJ19 CI deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PJ19 CI" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PJ19 CI" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.7.)

AUDIO (2019)

Airspace User supporting Demonstrations of Integrated Airport Operations

Read More  

PJ09-W2 DNMS (2019)

Digital Network Management Services

Read More  

PJ19-W2 CI (2019)

PJ.19 W2 Content Integration, Performance Management and Business Case Development

Read More