Opendata, web and dolomites

CEMCAP project deliverables

The page lists 36 deliverables related to the research project "CEMCAP".

 List of Deliverables

CEMCAP: list of downloadable deliverables.
title and desprition type last update

Optimized operation of an oxyfuel cement plant

A Report describing the full-scale optimized oxyfuel cement plant incorporating experimental results from WP7, WP8, WP9 will be delivered. Due to the changed atmosphere and additional parameters the operation will be more complex. Therefore the report will include procedure instructions about start-ups, shut-downs and optimal operational settings. A section will also include recommendations about training of operators

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

CEMCAP comparative techno-economic analysis of CO2 capture in cement plants

This deliverable describes process simulation results of the four different CO2 capture technologies and their integration into the CEMCAP reference cement plant, as well as the estimated costs associated with each technology. All technologies are analysed and compared from point of view of the KPIs defined in WP3.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Clinker cooler film

This is a video describing the oxyfuel clinker cooler installation and operation in WP9, at the HeidelC plant in Hannover. The film is a dissemination Activity and the work is therefore carried out by WP2 (Task 2.3). VDZ is responsible for storyboard and filming, while SINTEF-ER will do the final editing.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-08

Retrofitability study for CO2 capture technologies in cement plants

A description of to what the consequences are (footprint, influence on production process and product quality, extent of necessary construction work etc.) when retrofitting different CO2 capture technologies to cement plants, and to what extent retrofit is feasible.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Experimental investigation of CO2 liquefaction for CO2 capture from cement plants

Description of the undertaken CO2 liquefaction tests at low temperatures with gas composition input determined by Task 11.1. Documentation of experimental results such as retention time vs. separation efficiency, separator temperature vs. separation efficiency and CO2 product purity.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

CAP Process optimisation and comparison with pilot plant tests

The deliverable will report the results achieved with the optimisation of the CAP process model. Pilot plant test results will be taken into account. Aim of the document is to assess the CAP performance and to provide the input for the plant integration investigated in WP4. Mass and heat balance for each stream and component of the optimal process will be reported.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Oxyfuel suspension calciner test results

Summary report on conducted oxyfuel calcination tests. The report will summarize conducted experiments and results in respect to the operation and performance of oxyfuel suspension calcination under various relevant oxy-fuel conditions.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Case study of communication and public acceptance of CO2 capture in the cement industry

This deliverable will explore the Norcem approach to communication about on-site testing of CO2 capture in Brevik, Norway, including how local inhabitants and other stakeholders perceive different economic, social and environmental risks and benefits with CO2 capture in their own local community.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Calcium Looping CO2 capture for the cement industry – Demonstration of fluidized bed CaL at 200 kW scale and research on entrained flow CaL

The first and main part of the report summarizes the results of fluidized bed Calcium Looping (CaL) process demonstration trials under industrially relevant conditions at USTUTT’s 200 kWth pilot rig. In these pilot scale Calcium Looping demonstration trials, process conditions were adapted to cement specific requirements (e.g. use of cement specific flue gas and sorbent make-up, etc.) to demonstrate the technology at TRL 6. Optimum process conditions for the application of CaL to the cement process are key results presented in the report and will enable energetic evaluation. The second part of the deliverable presents final results from investigations on Calcium Looping CO2 capture in entrained flow environments (TRL=4). Special focus will be given to the sorbent performance results from additional experiments that have been conducted at the CSIC´s 30kWth carbonator reactor operated in entrained mode, after completion of D12.2.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Oxyfuel CFD-burner and large kiln simulations

Report on oxyfuel CFD simulations of the tested burner and on full-scale cement plant. The report will summarize results in respect to CFD model adaption and validation with experimental data obtained in WP7, as well as the results of the simulations of a large scale oxy-fuel cement kiln, including a results evaluation. The document will also provide input data and information from CFD simulations for the oxyfuel process simulation and optimisation in WP6.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Cost of critical components in CO2 capture processes

A description of the calculations of Size and cost of process components required for CO2 capture from cement plants. This provides the necessary basis for the techno-economic evaluation in D4.6

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-10-08

Analysis of oxyfuel clinker cooler operational performance

Due to the changed gas atmosphere the cooling performance could be changed which is directly influencing the product composition. Therefore the overall aim of this work package is the experimental testing of an oxyfuel cooler in an industrial surrounding in order to ensure a sufficient cooling performance (efficiency) and the product quality. The cooler performance will be evaluated based on the experimental data and the product quality on analysis of the gained samples.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Membrane-assisted CO2 liquefaction for CO2 capture from cement plants

Optimized simulation results and design for pilot- and full-scale membrane-assisted CO2-liquefaction; provides input to WP6. Process design for CO2 liquefaction unit, simulation results for CO2 liquefaction based on different input compositions from Task 11.1, optimised cases for each input composition and process parameters for minimum overall capture cost.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Membrane-assisted CO2-liquefaction scale up to TRL7-8

Describes the technical solutions required to proceed to on-site testing of membrane-assisted CO2 liquefaction on site at a cement plant. Preliminary design for combined membrane and CO2 liquefaction test plant for operating on-site at TRL7-8, taking user requirements into account. Includes process flow diagrams (PFDs)

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Post capture CO2 management – options for the cement industry

An overview of different options to dispose of CO2 captured from cement plants and potential for generating business case(i.e. technical-economic evaluation). Based on the potential, dedicated roadmaps will be made.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Design of post combustion capture and integrated calcium looping cement plant systems (M32)

The report will present a Full-scale process design and sizing, based on experimental work and using the finalized CaL process model, also outlining how to proceed with the CaL development for on-site testing to reach TRL 7-8.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Assessment of calciner test results

Assessment, and compilation of WP8 results for further use in WP6 oxyfuel process simulations. In this deliverable report results obtained in task 8.3 will be evaluated in respect to large scale application of suspension calcination under oxyfuel conditions. Moreover, key parameters and findings from experiments will be compiled to a concise chapter aiming to support designers of industrial scale oxyfuel suspension calciners. The deliverable will also provide input data and information from for the oxyfuel process simulation and optimisation in WP6.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Oxyfuel burner prototype performance tests

Report on the burner modifications and the results from oxyfuel tests with different solid fuels. The report will summarize details on the optimum burner design for oxy-fuel application to cement kilns as well as experimental results from 500 kW oxy-fuel burner tests and their evaluation. It will also provide input data and information from demonstration tests for the oxyfuel process simulation and optimisation in WP6.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CEMCAP Newsletter 7

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

CEMCAP Newsletter 6

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

Feasibility study and CAP process scale-up

This deliverable evaluates how to proceed with CAP process to on-site pilot/demo testing. Aim of the document is to provide strategic guidelines for a project follow-up and CAP progress to TRL7-8 for cement plants.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CEMCAP Newsletter 5

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

CEMCAP Strategic conclusions – progressing CO2 capture from cement plants towards demonstration

This deliverable is the final public CEMCAP document, and will that summarize the work and draws the strategic conclusions for further development and deployment of CCS in the cement industry.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CaL reactor modelling and process simulations

This report will cover final CaL process simulations results. The carbonator-calciner system will be modelled and simulated for different operating conditions. The process simulations will include the results of mass and energy balances of the two CaL processes assessed in this WP. The content of the deliverable will also be a basis for the process design achtivities in Task 12.4.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CEMCAP framework for comparative techno-economic analysis of CO2 capture from cement plants

With the progress of the project the framework will be updated to be in line with the requirements identified within the experimental CEMCAP work packages. A public framework report will be delivered, which provides transparency to the comparative analysis undertaken in WP2.2 = 4.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Plan for dissemination, exploitation and communication of results

The CEMCAP plan for communication will describe when, how, by whom communication actions will be undertaken and towards whom they are direced, . Plans for other dissemination activities (CEMCAP internal and CEMCAP/ECRA) and plans for exploitation of results will be described

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CEMCAP Newsletter 3

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

CEMCAP Newsletter 1

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

CEMCAP Newsletter 4

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

CEMAP website

The website will be the online source to all public information and results from CEMCAP. Alerts about website updates will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

Status-report on Calciner Technology

Description of industrially relevant boundary conditions for cement plant calciners. This report shall summarize the current state-of-the-art of different industrial cement calciner designs and expected alterations when operating those under oxyfuel conditions. It aims to be a comprehensive basis for the design of oxy-fuel calciner experiments in task 8.3.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Design and performance of CEMCAP cement plant with MEA post combustion capture

In analogy with D4.1, a techno-economic study is provided of the CEMCAP reference cement plant when equipped with CO2 capture using MEA. Stream data, additional energy consumption with CO2 capture, CO2 emissions, and estimated costs will be provided.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

CEMCAP Newsletter 2

The newsletters will contain highlights and other CEMCAP updates, and will be distributed via e-mail and posted on the website, alerts about new newsleters will be spread via Twitter and Facebook.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-06-05

Results of entrained flow carbonator/calciner tests

This report covers the experimental work with entrained flow carbonator and calciner for an integrated calcium looping process. The report will summarize conducted experiments and results with respect to the operation and performance of entrained flow carbonation and suspension calcination under various relevant conditions and cement plant specific particle sizes.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Results from 30 kWth CFB experiments

This report will cover the results of experiments under synthetic cement plant exhaust compositions delivering input to 200kWth tests. This will include results of experimental testing of different limestones, raw meals and operating windows for calcium looping in cement plant at a 30 kWth CFB bench scale plant.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05

Design and performance of CEMCAP cement plant without CO2 capture

Atechno-economic study of the CEMCAP reference cement plant without CO2 capture is provided with process stream data, energy consumption, fuel and power input, CO2 emissions, cement production rate and estimated costs.

Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2014

download deliverable 

Documents, reports 2019-06-05