Explore the words cloud of the BUStoB project. It provides you a very rough idea of what is the project "BUStoB" about.
The following table provides information about the project.
Coordinator |
STICHTING OPLEIDINGS- EN ONTWIKKELINGSFONDS VOOR HET TECHNISCH INSTALLATIEBEDRIJF*ST.POL.- EN ONTWIKK.FONDS TECH INSTALL.BEDR OTIB
Organization address contact info |
Coordinator Country | Netherlands [NL] |
Project website | http://www.buildupskills.nl |
Total cost | 1˙385˙775 € |
EC max contribution | 1˙385˙775 € (100%) |
Programme |
1. H2020-EU.3.3.7. (Market uptake of energy innovation - building on Intelligent Energy Europe) |
Code Call | H2020-EE-2014-3-MarketUptake |
Funding Scheme | CSA |
Starting year | 2015 |
Duration (year-month-day) | from 2015-03-01 to 2018-08-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | STICHTING OPLEIDINGS- EN ONTWIKKELINGSFONDS VOOR HET TECHNISCH INSTALLATIEBEDRIJF*ST.POL.- EN ONTWIKK.FONDS TECH INSTALL.BEDR OTIB | NL (WOERDEN) | coordinator | 253˙632.00 |
2 | STICHTING ISSO | NL (ROTTERDAM) | participant | 491˙825.00 |
3 | STICHTING SBRCURnet | NL (ROTTERDAM) | participant | 144˙316.00 |
4 | BOUWRADIUS TRAINING & ADVIES BV | NL (HAZERSWOUDE-DORP) | participant | 139˙451.00 |
5 | STICHTING KENTEQ | NL (HILVERSUM) | participant | 114˙925.00 |
6 | STICHTING REGIONAAL ONDERWIJS CENTRUM 'S HERTOGENBOSCH | NL ('S HERTOGENBOSCH) | participant | 60˙406.00 |
7 | STICHTING REGIONAAL OPLEIDINGENCENTRUM VAN TWENTE | NL (HENGELO) | participant | 60˙406.00 |
8 | STICHTING ROC MIDDEN NEDERLAND | NL (UTRECHT) | participant | 60˙406.00 |
9 | STICHTING ROC NIJMEGEN EO | NL (NIJMEGEN) | participant | 60˙406.00 |
10 | MBO RAAD | NL (WOERDEN) | participant | 0.00 |
11 | STICHTING KENTEQ, KENNISCENTRUM BEROEPSONDERWIJS BEDRIJFSLEVEN VOOR TECHNIEK | NL (HILVERSUM) | participant | 0.00 |
This project is directed towards establishing and upgrading large-scale qualification and training schemes in the Netherlands for craftsmen and other on-site workers, in the continuation of the BUILD Up Skills Initiative. The proposed project uses the results of the IEE-projects and is a necessary step towards closing the gap between existing and needed skills for craftsmen and building workers in the Netherlands in the respect of meeting the 2020 energy objectives.The main objective of the project is to develop and pilot missing training materials on EQF-levels 2 - 4 based on the future-ready qualification schemes developed in BUILD UP Skills Pillar II. Secondary objective is to construct short skill measurement tests which enables the prevention of mistakes made by unconsciously incompetent workers, the detection of skills gaps and supply of industry relevant upskilling advice to craftsmen and building workers.Tertiary objective is to organise regional pilots in which we focus on implementation and evaluation of the developed materials and regional capacity building. We will support regional training partnerships with train-the-trainer sessions, regional labour market intelligence and implementing the developed trainings and assessments in practice in regional building and/or renovation projects. As results of the project the following will be achieved: • Increase the skills of 3000 craftsmen by the end of year 2018 • Increase in RES-production of 11 GWh/year • Decrease of energy consumption of 69 GWh/year (EE) • Increase the employability of the building workforce with 3000 of which at least 5% women • Increase in investments in innovative sustainable energy technologies with €42.7 million • Acquired additional funding of €1.000.000,- to sustain the action
Document with the most relevant changes made to the training materials | Documents, reports | 2019-03-25 14:46:50 |
Nine newsletters | Documents, reports | 2019-03-25 14:46:50 |
Compilation of entries in national media | Documents, reports | 2019-03-25 14:46:50 |
Assessment types and contents | Documents, reports | 2019-03-25 14:46:49 |
Main communication means | Documents, reports | 2019-03-25 14:46:49 |
A report on the results of the regional upskilling actions | Documents, reports | 2019-03-25 14:46:49 |
First progress report | Documents, reports | 2019-03-25 14:46:50 |
Report on train the trainer sessions | Documents, reports | 2019-03-25 14:46:49 |
Communication material | Documents, reports | 2019-03-25 14:46:49 |
A memo with an overview of available regional partnerships | Documents, reports | 2019-03-25 14:46:49 |
Functional design for assessment tool | Documents, reports | 2019-03-25 14:46:49 |
Repositories with building errors | Documents, reports | 2019-03-25 14:46:49 |
Evaluation of extended BUILD UP Skills-app | Documents, reports | 2019-03-25 14:46:49 |
Report on energy performance indicators | Documents, reports | 2019-03-25 14:46:50 |
A report with the inventory and analysis of projects to attract women to the construction sector | Documents, reports | 2019-03-25 14:46:50 |
Reports on national work conferences | Documents, reports | 2019-03-25 14:46:50 |
Final result-oriented report | Documents, reports | 2019-03-25 14:46:50 |
From each pilot a progress report on the actual upskilling | Documents, reports | 2019-03-25 14:46:49 |
Communication-, dissemination- and endorsement plan | Documents, reports | 2019-03-25 14:46:49 |
Labour market analysis | Documents, reports | 2019-03-25 14:46:49 |
Report on development of training materials | Documents, reports | 2019-03-25 14:46:50 |
Extended BUILD UP Skills-App | Documents, reports | 2019-03-25 14:46:49 |
Reports on endorsement meetings | Documents, reports | 2019-03-25 14:46:50 |
Report on ethics | Documents, reports | 2019-03-25 14:46:50 |
Report on reviewing and testing of the modules | Documents, reports | 2019-03-25 14:46:50 |
Take a look to the deliverables list in detail: detailed list of BUStoB deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "BUSTOB" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "BUSTOB" are provided by the European Opendata Portal: CORDIS opendata.