Opendata, web and dolomites

GT SIGNED

Green battery-less Tire Pressure Monitoring System

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "GT" data sheet

The following table provides information about the project.

Coordinator
FARSENS, S.L 

Organization address
address: PASEO MIKELETEGI 54 0 1 2
city: GUIPUZCOA
postcode: 20009
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.farsens.com/en/site/green-battery-less-tire-pressure-monitoring-system-gt
 Total cost 803˙179 €
 EC max contribution 562˙225 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-04-01   to  2017-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FARSENS, S.L ES (GUIPUZCOA) coordinator 562˙225.00

Map

 Project objective

The main objective of the project is the growth and internationalization of FARSENS by the development of a Tire Pressure Monitoring Systems (TPMS), an electronic system in charge of the monitoring of the wheels air pressure, providing a real-time information. This information is very useful in regarding security, but also in terms of gas consumption, and thus in terms of reducing air pollution. Besides the intrinsic interest of this system in relation to security and environment, it is also mandatory by legislation to be installed in all the new cars in the USA and it will be mandatory by the end of 2014 for all new models, what makes an increment of around 50 million vehicles equipped with this system until 2015. Taking into account 4 devices per vehicle, it turns out in 200million TPMS units. This project will lead the company growth for the next years from a high technology solution developer to an important stakeholder in automotive industry. During the last years the main strategy of the company has been focused on creating a reliable structure in order to ensure the success once one of the developed products entries the market. This project is “natural” as it is the next logical step to develop its strategy. FARSENS battery less solution meets all technical specifications and minimizes costs due to: 1-Cost-effectiveness (less subcomponents and the new design makes it half the actual cost). FARSENS solution is based on a battery less system and a 99% of inclusion of the sensor’s functionalities in only one ASIC. These decreases the cost of the components and assembly cost. 2-Saving due to less waste management and easier recycling (there is not battery), without compromising the quality or the service. Thanks to the SME instrument, 2017 could be the year with the first sales, with an estimated 28% profit (0.55 M€) and during 2018 it is estimated an accumulated balance of 0.5 M€, being the ROI only 2 years.

 Deliverables

List of deliverables.
TPMS sensor system Demonstrators, pilots, prototypes 2019-05-30 12:47:01
Patents Documents, reports 2019-05-30 12:47:01
TPMS RFID sensor system Demonstrators, pilots, prototypes 2019-05-30 12:47:01

Take a look to the deliverables list in detail:  detailed list of GT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

GT WHR system (2015)

Green Turbine WHR System

Read More  

LIFE-BATTERY (2015)

Long lifespan battery for hybrid vehicles

Read More  

TFS (2016)

Tunnel fire stopper or TFS shortly

Read More