Opendata, web and dolomites

FREEWAY SIGNED

FREEWAY : safely and effortless commute in an urban environment

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "FREEWAY" data sheet

The following table provides information about the project.

Coordinator
FREEWAY SAS 

Organization address
address: 17 AV MIRABEAU
city: NICE
postcode: 6000
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Project website http://www.freeway.pro
 Total cost 2˙364˙343 €
 EC max contribution 1˙655˙040 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-06-01   to  2017-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FREEWAY SAS FR (NICE) coordinator 1˙655˙040.00

Map

 Project objective

It is not a bike, it is not a scooter, it is a lot better, it’s FREEWAY: a new revolutionary means of transportation allowing to safely and effortlessly commute in an urban environment. Protected by a worldwide patent, FREEWAY is a small and clean scooter, on three wheels. FREEWAY is unique since it is very light, 14kg, with 2 front wheels for stability and safety, a back wheel that includes the electric engine, and it is fitted with latest generation batteries. FREEWAY may be folded and unfolded within seconds. When folded, it can be carried along, on its two front wheels like a suitcase. Therefore, FREEWAY may be kept with you at all times and is perfectly suitable for intermodal mobility. FREEWAY is an hybrid type of bike with no equivalent product on the market; nevertheless, its market is already very broad. The most direct competition of FREEWAY comes from electric bikes, with a good market growth rate that should be 9.1% over the 2013-2020 period, to reach a market of 1,9 million in Europe. The main objective of FREEWAY business innovation project is the transfer of a new innovative and competitive solution seizing European transport sector opportunities with the view of providing profitability and growth. The specific objectives will be to provide technological and economic viability of FREEWAY electro mobility concept in order to develop a market strategy ensuring Europe wide market uptake, support growth and self-sufficiency at mid-term and participate to Europe bike industry leadership. In addition, FREEWAY business innovation project will address urban environmental and mobility defies by offering the market with an innovative electric powered vehicle which is more light, more practicable, more safe and secure and more trendy for the users, thus, improving users’ quality of life with an innovation offering a door-to-door environmentally-efficient mobility that will quickly and successfully break into European market.

 Deliverables

List of deliverables.
1.1.b Final definition plan Demonstrators, pilots, prototypes 2019-05-30 12:55:11
1.3 Specifications Documents, reports 2019-05-30 12:55:20
1.1.c Optimized prototype Demonstrators, pilots, prototypes 2019-05-30 12:55:19
5.4.a Events participation Websites, patent fillings, videos etc. 2019-05-30 12:55:10
1.1.d one scientific arrticle Websites, patent fillings, videos etc. 2019-05-30 12:55:14
2.1.a call for tender Websites, patent fillings, videos etc. 2019-05-30 12:55:22
1.2 Outsourcing strategy Documents, reports 2019-05-30 12:55:11
4.2.a List of retailers Documents, reports 2019-05-30 12:55:03
2.4 Standard prototype Demonstrators, pilots, prototypes 2019-05-30 12:55:14
2.2 value enfineering Documents, reports 2019-05-30 12:55:07
5.7.b Interim reports Documents, reports 2019-05-30 12:55:08
4.2.c Reports of Sales Representatives Documents, reports 2019-05-30 12:55:11
5.5 Prpject dashboards Other 2019-05-30 12:55:09
5.1 Communication plan Other 2019-05-30 12:55:19
4.2.b Planing of Sales Representatives Documents, reports 2019-05-30 12:55:01
2.1.b Selected sub-contractors Documents, reports 2019-05-30 12:55:13
4.1 Dissemination Material Websites, patent fillings, videos etc. 2019-05-30 12:55:04

Take a look to the deliverables list in detail:  detailed list of FREEWAY deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FREEWAY" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "FREEWAY" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

GT WHR system (2015)

Green Turbine WHR System

Read More  

LIFE-BATTERY (2015)

Long lifespan battery for hybrid vehicles

Read More  

TFS (2016)

Tunnel fire stopper or TFS shortly

Read More