Explore the words cloud of the NZE Buildings project. It provides you a very rough idea of what is the project "NZE Buildings" about.
The following table provides information about the project.
Coordinator |
ECOXIA SAS
Organization address contact info |
Coordinator Country | France [FR] |
Project website | http://www.ecoxia.fr |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy) 2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2014 |
Funding Scheme | SME-1 |
Starting year | 2015 |
Duration (year-month-day) | from 2015-05-01 to 2015-10-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | ECOXIA SAS | FR (YERRES) | coordinator | 50˙000.00 |
'The building sector is responsible for the majority of the energy consumption in the world. It is also a key challenge for the 20-20-20 strategy of the EU.
Sustainable housing starts with 'near zero-energy' buildings, i.e. homes that are so well insulated that it becomes easy to produce more renewable energy on site than what is consumed.
Today, house construction in Europe is mainly performed by craftsmen who are small local builders and who work with traditional technics and who are not keen to invest on research and development of Modern Methods of Construction (MMC). As a consequence, it remains very difficult for consumers and investors to buy 'plus energy' houses in Europe (costs and lack of offer due to lack of know-how).
The objective of the project is to provide to local builders the products and the tools so that they can offer to their customers 'nearly zero-energy' buildings with guaranteed performance and cost controls.
To do so, ECOXIA has developed the concept of 'Smart Envelope'. Built in the ideal conditions of the factory, the envelope is installed in a 'Plug & Play' way on site in one day. It includes both energy performance and the components to make it smart.
ECOXIA developed a prototype in 2012 to check the performance of its building envelope. Installed in Yerres, France, it proved the interest of the concept from a mechanical, thermal, comfort and cost standpoints. The recorded consumption proves that the prototype is a 'plus energy' building with the production of only 20 sqm of photovoltaic solar panels.
To be able to commercialise the right solution and help Europe to develop a new industry, ECOXIA needs to go further into its feasibility study by addressing the following questions: - which is the best level of prefabrication? - how can we improve the price of our solution for the European market ? - who are the best potential partners for our project in Europe? - what are the regulatory issues on the most relevant markets in Europe?'
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "NZE BUILDINGS" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "NZE BUILDINGS" are provided by the European Opendata Portal: CORDIS opendata.