Explore the words cloud of the CLOUD DIAGNOSIS project. It provides you a very rough idea of what is the project "CLOUD DIAGNOSIS" about.
The following table provides information about the project.
Coordinator |
ITESTIT SL
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://smartive.eu/ |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy) 2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2014 |
Funding Scheme | SME-1 |
Starting year | 2015 |
Duration (year-month-day) | from 2015-05-01 to 2015-10-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | ITESTIT SL | ES (TERRASSA) | coordinator | 50˙000.00 |
At least 3% of wind production downtime due to breakdowns and maintenance problems that can reach up to 40%. This leads to production losses of over €2.9 billion worldwide annually.
Our current SmartCast remotely connects SCADA and sensor data with a virtual database to monitor wind turbines. It involves algorithms based AI, cloud computing and data mining. The SmartGear product is a low cost Condition Monitoring System based on IoT technology which acquires raw data and connects with SmartCast Platform for further processing.
The overall objective of the future Phase II Cloud Diagnosis project is to scale-up our SmartGear technology by introducing communication protocols that allow us to extract data from multiple devices allocated in the wind turbines and additional transducers. Additionally, SmartCast cloud diagnosis algorithms need to be improved.
Our innovative solution will allow faster detection of wind turbine system failures through complex algorithms implementing intelligent sensor fusion, therefore, optimizing the performance of wind turbines. It does not require onsite visits but provides information online. In this way, our technology will be able to:
Reduce wind turbine maintenance cost by 20%: €44 million annually in the Spanish market, €190 million per year in Europe and €440 million annually in the world market.
Reduce wind turbine operation cost and component replacement of cost by 20%: A standard park of 50 MW (16 turbines) installation power working 2,100 hours per year faces production losses of at least €378,000 annually. Our system enables 20% savings of €75,600 (€4,725 per turbine).
Currently, our SmartCast platform processes real-time data from SCADA and sensors by means of SVM (support vector machine) in 300 turbines. Our SmartGear Solution is present in two wind farms and is being rolled out in five more.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CLOUD DIAGNOSIS" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "CLOUD DIAGNOSIS" are provided by the European Opendata Portal: CORDIS opendata.