Explore the words cloud of the WELL project. It provides you a very rough idea of what is the project "WELL" about.
The following table provides information about the project.
Coordinator |
LEUNAMME ENGINEERING S.L.U.
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://koalalifter.com |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy) 2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2015 |
Funding Scheme | SME-1 |
Starting year | 2015 |
Duration (year-month-day) | from 2015-09-01 to 2016-02-29 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | LEUNAMME ENGINEERING S.L.U. | ES (GORRAIZ-EGUES) | coordinator | 50˙000.00 |
The “WELL” system, protected by patent in Europe and in the USA is an innovation and technological advancement on a global scope, that allows the assembly and replacement of the blades of a wind turbine on a wind farm without needing to use large tonnage cranes, by using a “telescopic lift” system that uses the turbine wind tower itself as a support system. It can be operated by no more than 3 workers (vs 14), work can be completed in less than 24 hours (vs. 72), and in winds of up to 12 metre/second (vs. <7m/s), thus minimizing the number of accidents, reducing the waiting period for blade replacements, reducing the cost of the operation by more than 90%, and also reducing the profit loss for wind farm operators (approximately €2000 per day). Leunamme Engineering has an agreement with Iberdrola to launch the WELL system. WELL is aligned with the global target «20-20-20» of the European Union.
The main customer groups of WELL system are the wind farms operators, and manufacturers of wind turbines. They are interested in reducing maintenance costs and in maximizing the operational hours of the wind farm, because O&M expenses are becoming critical in order to be more competitive and less dependent on public support.
Through this Feasibility Analysis, the design of a technological scalability and commercial expansion strategy of the company services at a European and global level have been approached, in order to include other generator models and other large components of wind turbines. Phase II would consider the implementation of the technological scaling development of WELL system.
The WELL proposal was presented for the first time to the last call of the SME-Intrument program (18-03-2015, SIE-01-2015 1 P) achieving a total score of 12,88. The only weak point in the evaluation was the lack of a risks analyisis. An appropriate technical and business risks analysis, and their associated contingency plans, has been included in this new submission of the proposal.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WELL" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "WELL" are provided by the European Opendata Portal: CORDIS opendata.