Explore the words cloud of the REACMIN project. It provides you a very rough idea of what is the project "REACMIN" about.
The following table provides information about the project.
Coordinator |
TIESSEPI SRL
Organization address contact info |
Coordinator Country | Italy [IT] |
Project website | http://www.lacecosasrl.it/ |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials) 2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2015 |
Funding Scheme | SME-1 |
Starting year | 2015 |
Duration (year-month-day) | from 2015-08-01 to 2015-10-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | TIESSEPI SRL | IT (TORTONA) | coordinator | 50˙000.00 |
The REACMIN solution developed by TIESSEPI envisions a treatment plant which will allow the thermally induced crystal-chemical transformation of 400,000 tonnes of Asbestos Containing Materials (ACM) in 5 years. TIESSEPI’s system will thus place in the market a completely transformed asbestos-free product suitable to be used as a Secondary Raw Material (SRM) for other industrial uses such as concrete production, road building or environmental restoration with a forecasted turnover of 10 million Euros in five years per each installed plant. Before the discovery of its high toxicity, asbestos was for a long time considered as an extremely versatile and cheap raw material for building materials, automotive parts and even textile and other domestic products. In Europe, more than 40% of residential buildings were constructed before the 1960s and in the 1990s a large boom in construction still used asbestos. Health costs for diseases related to asbestos exposure amount over M€ 1,600 per year in Europe , so it is a main target to remove all remaining ACM. Only in Italy 2 billion m2 of asbestos-cement slates still cover roofs of industrial plants and civil buildings . Moreover, yet in 2012, rather than falling, worldwide asbestos production increased. The most extended current process for asbestos disposal is landfill in authorized sites. Associated costs are expensive, in the range of 150-300 €/Tn and no zero risk of fibres emission can be assured in the medium-long term. Other technologies based in thermal conversion exist but the only one at commercial level is up to 13 times more expensive than REACMIN system. The objectives of REACMIN project are: Demonstrate the technology by building a pilot plant with optimal security measures and acceptable costs (< 65 €/Tn). Test the resulting product suitability for the industrial production of concrete tiles Expand business model in other real industrial processes (glass, ceramics) Assure Zero risk of fibres release
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "REACMIN" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "REACMIN" are provided by the European Opendata Portal: CORDIS opendata.
FEASIBILITY ASSESSMENT OF THE GREEN “ProTreaT” TECHNOLOGY FOR PROTEIN-BASED, NATURAL REMOVAL OF HEAVY METALS FROM WATER AND WASTEWATER
Read More