Opendata, web and dolomites

RAGTIME

Risk based approaches for Asset inteGrity multimodal Transport Infrastructure ManagEment

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "RAGTIME" data sheet

The following table provides information about the project.

Coordinator
FUNDACION TECNALIA RESEARCH & INNOVATION 

Organization address
address: PARQUE CIENTIFICO Y TECNOLOGICO DE BIZKAIA, ASTONDO BIDEA, EDIFICIO 700
city: DERIO BIZKAIA
postcode: 48160
website: www.tecnalia.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://ragtime-asset.eu/
 Total cost 3˙325˙912 €
 EC max contribution 2˙998˙412 € (90%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
 Code Call H2020-MG-2015_TwoStages
 Funding Scheme RIA
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2019-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    FUNDACION TECNALIA RESEARCH & INNOVATION ES (DERIO BIZKAIA) coordinator 504˙125.00
2    RINA CONSULTING SPA IT (GENOVA) participant 417˙500.00
3    AON SPA INSURANCE & REINSURANCE BROKERS IT (MILANO) participant 256˙000.00
4    ACCIONA CONSTRUCCION SA ES (ALCOBENDAS) participant 246˙250.00
5    NETWORK RAIL INFRASTRUCTURE LIMITED UK (LONDON) participant 231˙250.00
6    UNIVERSIDAD DE CANTABRIA ES (SANTANDER) participant 230˙000.00
7    FORUM DES LABORATOIRES NATIONAUX EUROPEENS DE RECHERCHE ROUTIERE BE (Brussels) participant 200˙062.00
8    LGI CONSULTING FR (PARIS) participant 171˙875.00
9    SLOVENSKE ZELEZNICE INFRASTRUKTURA DRUZBA ZA UPRAVLJANJE IN VZDRZEVANJE ZELEZNISKE INFRASTRUKTURE TER VODENJE ZELEZNISKEGA PROMETA DOO SI (Ljubljana) participant 156˙250.00
10    LOUIS BERGER SPAIN SA ES (SANTANDER) participant 151˙100.00
11    ZAVOD ZA GRADBENISTVO SLOVENIJE SI (LJUBLJANA) participant 150˙875.00
12    AISCAT SERVIZI SRL IT (ROMA RM) participant 144˙750.00
13    ANTEA SRL IT (PADOVA) participant 138˙375.00
14    SMARTEC SA CH (MANNO) participant 0.00

Map

 Project objective

An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define methods and tools for asset tracking, management of maintenance activity, determine the life cycle and replacement costs of the assets, assistance in determining funding strategies, optimizing capital investments in operation and maintenance, and help with the replacement of assets. Currently, the procurement, design, construction, exploitation and public communication to the final users and society regarding to the land transport infrastructures are: • not multimodal, not cross-assets, but focused on individual assets. • not correctly linked, not being able to exchange information by different stakeholders. • lack of a common risk based approach and the implementation of resilient concepts throughout the whole life cycle The aim of the proposal is to establish a common framework for governance, management and finance of transport infrastructure projects in order to ensure the best possible return from limited investment funds in transport infrastructures The main objective of RAGTIME is to develop, demonstrate and validate an innovative management approach and to lay out a whole system planning software platform, based on standard multiscale data models, able to facilitate a holistic management throughout the entire lifecycle of the infrastructure, providing an integrated view of risk based approach, implementing risk based models, resilient concepts and mitigation actions, with specific reference to climate change related threats perspective, and monitored with smart systems, in order to optimize ROI, management, guarantee LOS and improve resilience through maintaining the service.

 Deliverables

List of deliverables.
Second stakeholder workshop report Documents, reports 2020-03-25 15:27:18
RAGTIME Final Conference report Documents, reports 2020-03-25 15:27:18
Operational Decision Support approach Documents, reports 2020-03-25 15:27:18
Performance-based and predictive modelling approaches Documents, reports 2020-03-25 15:27:17
Stakeholder assessment and business models characterisation in the transport infrastructure sector Documents, reports 2020-03-25 15:27:17
Overview of the existing framework in the risk analysis in transport infrastructure projects Documents, reports 2020-03-25 15:27:17
Mapping of European practices, recommendations, standards and tools on the management and the management needs of different sectors of transport infrastructures Documents, reports 2020-03-25 15:27:17
First stakeholder workshop report Documents, reports 2020-03-25 15:27:17
Validation Report No1 Documents, reports 2020-03-25 15:27:18
Dissemination tools Documents, reports 2020-03-25 15:27:17
Benchmark Report No2 Documents, reports 2020-03-25 15:27:18
Benchmark Report No1 Documents, reports 2020-03-25 15:27:18
Dissemination and Communication plan Documents, reports 2020-03-25 15:27:17
Validation Strategy Documents, reports 2020-03-25 15:27:17

Take a look to the deliverables list in detail:  detailed list of RAGTIME deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 FEHRL
DESIGN & PRODUCTION SYSTEMSRAGTIME Innovative Asset Management
published pages: 12, ISSN: , DOI:
FEHRL Infrastructure Research Magazine (FIRM 2018 January) Issue 11 2020-03-25
2019 Zalbide, M., Garcia Sanchez, D., Aurtenetxe, J., Izkara, J. L., Fuggini, C., Di Gennaro, F., Perez, M. A., Pani, C.
RAGTIME Risk based approaches for Asset inteGrity multimodal Transport.
published pages: , ISSN: , DOI:
TRA Conference, 16-19 April 2018 Biannual 2020-03-25
2017 FEHRL
RAGTIME INVESTIGATES RISK BASED APPROACHESFOR ASSET INTEGRITY MULTIMODAL TRANSPORTINFRASTRUCTURE MANAGEMENT
published pages: 6, ISSN: , DOI:
FEHRL Infrastructure Research Magazine (FIRM 2017 January) Issue 9 2020-03-25

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "RAGTIME" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "RAGTIME" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.)

CIVITAS ELEVATE (2019)

CIVITAS ELEVATE - CIVITAS 2020 Coordination and Support Action

Read More  

ALTERNATE (2020)

ASSESSMENT ON ALTERNATIVE AVIATION FUELS DEVELOPMENT

Read More  

FLiPASED (2019)

FLIGHT PHASE ADAPTIVE AERO-SERVO-ELASTIC AIRCRAFT DESIGN METHODS

Read More