GEMex project deliverables

The page lists 11 deliverables related to the research project "GEMex".

 List of Deliverables

GEMex: list of downloadable deliverables.
title and desprition type last update

Strategic communication plan

Report on the Strategic Communication Plan (M10, 18, 24). This deliverable describes the activities will be performed in Task 2.1. In particular, the report will be focused on the formulation and the coordination of the project communication strategy. Specific tasks, roles and goals will be reported. The D2.1 will be released in month 10, and will be updated in months 18 and 24. The effectiveness of the Strategic communication plan will be assessed during the project (also after) by some indicators as: i) number of website visit, ii) number of documents (Deliverables, e-news, brochures) download from website, iii) number of the datasets download, iv) attendance at the foreseen events, v) number of published scientific or technical articles.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Minutes of General Assebly meeting 2

The third General Assembly Meeting will take place after two project years in Mexico, together with the Mexican partners. The minutes should summarise all relevant information exchanged at this meeting and document all decisions made by the General Assembly. (Deliverable connected to Task 1.4)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Final report on understanding from exhumed systems

Final report on the understanding from exhumed systems, as described in task 4.2. This includes the results from field and laboratory works, kinematic reconstruction and related findings on exhumed systems, measurements and concepts.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Mid-term report to the commission

Mid-term report to the commission including:
a) an overview, including a publishable summary of the progress of work towards the
objectives of the project, including achievements and attainment of any milestones and
deliverables identified in Annex I. This report should include the differences between
work expected to be carried out in accordance with Annex I and that actually carried
out,
b) an explanation of the use of the resources, and
c) financial statements
(Deliverable connected to Tasks 1.1-1.3)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Report on the hydrogeological model of Los Humeros

D3.3 is a report on the hydrogeological model of the Los Humeros area integrating a possibly simplified version of the 3D geological model (D3.1). The report will detail the data integrated in the model as well as their interpretation and the resulting (hydrogeological) conceptual model. A focus will be made on the interactions between geological and hydrogeological modelling.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Minutes of Kick-off meeting

The kick-off meeting will take place in Mexico. This deliverable should summarise all relevant information exchanged during the meeting. First decisions of the General Assembly will be documented. (Deliverable connected to Task 1.4)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Project Website running

\"Project Website with both public access and \"\"Project Partner area” (VRE) (M3). This deliverable is related to Task 2.2. The website will be released in month 3 and will be updated by the end of the project (M36). The website includes all the documents produced during the project and specific sections for involved stakeholders. The website will remain ‘live’ for minimum two years after the project completion. The accesses to the website will be monitored so that the number of the site access and the indexing on the search engines will constitute indicators to rate the deliverable effectiveness.\"

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Websites, patent fillings, videos etc. 2019-11-27

Project Management Plan

Detailed Project Management Plan with a Gantt chart and a Work Breakdown Structure (WBS). It will include a schedule per task, responsible partner, related subtasks, related deliverables, and dependencies to other tasks. The document will be updated and revised in the course of the project and updates will be reported (one just before the end of the first reporting period and one just before the end of the second reporting period). (Deliverable connected to Tasks 1.5 and 1.6)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Open access database running

Report on the Open access database (M3). This deliverable will report the main actions performed in Task 2.3. The report will include the description of the database implementation and the collected data. Geothermal data, in the form of maps, datasets and models will be organized and collected in a open access database and will be made available in a spatial data infrastructure according to international standards and protocols. Part of this deliverable will be in the form of a handbook to help user to access the available information. The database produced will be available by a dedicated link in the project website and will be updated by the end of the project (M36). The number of the report of download as well as the access number to the online database will guarantee a feedback on the efficacy of this deliverable.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Minutes of General Assembly 1

The second General Assembly Meeting will take place after one project year in Europe, but together with the Mexican partners. The minutes should summarise all relevant information exchanged at this meeting and document all decisions made by the General Assembly. (Deliverable connected to Task 1.4)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27

Report on synthetic model calculations to optimize the results of 3D MT/TEM

Report on synthetic model calculations to optimize the results of 3D MT/TEM
Refers to task 5.1.1. Contains results of model calculations that will show how different but realistic synthetic resistivity models from high temperature geothermal fields will appear in real MT and TEM data. Furthermore, demonstrate how artefacts can emerge in inversion of resistivity data.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-23-2016

download deliverable 

Documents, reports 2019-11-27