The page lists 6 deliverables related to the research project "NEWTON".

 List of Deliverables

NEWTON: list of downloadable deliverables.
title and desprition type last update

Definition of instrument requirements and architecture. Design guidelines

This report will include the initial system requirements and architecture definition, as well as the initial interfaces of the different prototypes (three prototypes) developed in the project. The document will also include the description of the different key building blocks which integrate the overall system and their inputs/outputs.

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Documents, reports 2019-08-30

Preliminary design report for the electronic control block

This deliverable will report the preliminary design of the electronic control block. D3.2 will be based on a breadboard (not deliverable).

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Documents, reports 2019-08-30

Preliminary design report for the magnetic head

This deliverable will report the preliminary design of the magnetic head. D3.1 will be based on a breadboard (not deliverable).

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Documents, reports 2019-08-30

NEWTON website

The project website will provide detailed information about the project objectives and activities. It will consist of two parts: a public part and a private part: The public part will be opened to the general readership and it will be regularly updated with the latest activities within the project. It will also include access to the public deliverables of NEWTON project. The private part of the website will be only accessible to the members of the consortium and will be protected by password. This private part will have access to all NEWTON deliverables and milestones, contact information to facilitate the communication among consortium partners as well as access to the information sharing tools employed during the project. The website will be created and maintained by the Project Coordinator, with the support from all the partners.

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Websites, patent fillings, videos etc. 2019-08-30

Preliminary design report for the power distribution block

This deliverable will report the preliminary design of the power distribution block. D3.3 will be based on a breadboard (not deliverable).

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Documents, reports 2019-08-30

First project period report summary

This report is a summary report of the first project period.

Programme: H2020-EU.2.1.6.2. - Topic(s): COMPET-5-2016

download deliverable 

Documents, reports 2019-08-30