Explore the words cloud of the S-CODE project. It provides you a very rough idea of what is the project "S-CODE" about.
The following table provides information about the project.
Coordinator |
THE UNIVERSITY OF BIRMINGHAM
Organization address contact info |
Coordinator Country | United Kingdom [UK] |
Project website | http://www.s-code.info |
Total cost | 4˙999˙771 € |
EC max contribution | 4˙999˙771 € (100%) |
Programme |
1. H2020-EU.3.4.8.3. (Innovation Programme 3: Cost Efficient and Reliable High Capacity Infrastructure) |
Code Call | H2020-S2RJU-OC-2016-01-2 |
Funding Scheme | Shift2Rail-RIA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-11-01 to 2019-10-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | THE UNIVERSITY OF BIRMINGHAM | UK (BIRMINGHAM) | coordinator | 1˙731˙830.00 |
2 | DT - Výhybkárna a strojírna, a.s. | CZ (PROSTEJOV) | participant | 623˙250.00 |
3 | RAIL SAFETY AND STANDARDS BOARD LIMITED | UK (LONDON) | participant | 507˙500.00 |
4 | RHOMBERG RAIL CONSULT GMBH | AT (BREGENZ) | participant | 503˙750.00 |
5 | COMSA SAU | ES (BARCELONA) | participant | 435˙750.00 |
6 | LOUGHBOROUGH UNIVERSITY | UK (LOUGHBOROUGH) | participant | 321˙800.00 |
7 | VYSOKE UCENI TECHNICKE V BRNE | CZ (BRNO STRED) | participant | 318˙235.00 |
8 | FERROVIAL AGROMAN SA | ES (MADRID) | participant | 287˙187.00 |
9 | UNIVERZITA PARDUBICE | CZ (PARDUBICE) | participant | 270˙468.00 |
10 | RHOMBERG SERSA RAIL HOLDING GMBH | AT (BREGENZ) | participant | 0.00 |
The overall aim of the S-CODE project is to investigate, develop, validate and initially integrate radically new concepts for switches and crossings that have the potential to lead to increases in capacity, reliability and safety while reducing investment and operating costs.
The S-CODE project will identify radically different technology concepts that can be integrated together to achieve significantly improved performance for S&C based around new operating concepts (e.g. super-fast switching, self-healing switch).
The project will build on existing European and national research projects (in particular, the lighthouse project In2Rail, Capacity4Rail and Innotrack) to bring together technologies and concepts that will significantly reduce the constraints associated with existing switch technologies and develop a radically different solution.
The project will be divided into three phases: Phase 1: Requirements and initial design - focusing on understanding constraints and critical requirements, and developing a radically different architecture and operation that makes use of technologies from other domains; Phase 2: Technical development - undertaking detailed modelling and simulation to identify an optimal configuration to maximise performance; Phase 3: Validation and evaluation - testing (to TRL4) the design concepts and formally evaluating their performance in order that an integrated design can be presented for further development.
Review of definitions, standard operating parameters, best practice and requirements, including future technologies and horizon scanning | Documents, reports | 2019-09-09 15:21:57 |
High level architecture design document | Documents, reports | 2019-09-09 15:21:57 |
Take a look to the deliverables list in detail: detailed list of S-CODE deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2019 |
Jou-Yi Shih, Paul Weston, Edd Stewart, Nikhil Pillai, Mani Entezami, Clive Roberts Potential condition monitoring system for S&C using accelerometers published pages: , ISSN: , DOI: |
International Workshop on Railway Noise IWRN13 | 2020-01-28 |
2020 |
Saikat Dutta , Ramakrishnan Ambur, Moussa Hamadache, Osama Olaby, Jou-Yi Shih, Edwart Stewart , Roger Dixon Health Monitoring Of a Railway Track Switch Actuator Based On Continuous-Time Parameter Estimation Method published pages: , ISSN: , DOI: |
Rethinking Transport - Transport Research Arena 2020 Helsinki | 2020-01-28 |
2019 |
Moussa Hamadache, Saikat Dutta, Ramakrishnan Ambur, Osama Olaby, Edwart Stewart, and Roger Dixon Residual-based Fault Detection Method- Application to Railway Switches & Crossings (S&C) System published pages: , ISSN: , DOI: |
International Conference on Control, Automation and Systems (ICCAS2019) | 2020-01-28 |
2019 |
Moussa Hamadache, Saikat Dutta, Osama Olaby, Ramakrishnan Ambur, Edward Stewart, Roger Dixon On the Fault Detection and Diagnosis of Railway Switch and Crossing Systems: An Overview published pages: 5129, ISSN: 2076-3417, DOI: 10.3390/app9235129 |
Applied Sciences 9/23 | 2020-01-28 |
2018 |
Jiaqi Ye, Edward Stewart, Clive Roberts Use of a 3D model to improve the performance of laser-based railway track inspection published pages: 337-355, ISSN: 0954-4097, DOI: 10.1177/0954409718795714 |
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 233/3 | 2020-01-28 |
2020 |
Ramakrishnan Ambur, Saikat Dutta, Jou-Yi Shih, Sakdirat Kaewunruen, Edward Stewart, Roger Dixon, Clive Roberts, Lukáš Raif, Miquel Morata, Christopher Ward, Otto Plášek, Stefan Knittel, Martin Kohout Development and Evaluation of New Concepts and Systems for Railway Switches and Crossings published pages: , ISSN: , DOI: |
Rethinking Transport - Transport Research Arena 2020 Helsinki | 2020-01-28 |
2019 |
Sakdirat Kaewunruen, Qiang Lian Digital twin aided sustainability-based lifecycle management for railway turnout systems published pages: 1537-1551, ISSN: 0959-6526, DOI: 10.1016/j.jclepro.2019.04.156 |
Journal of Cleaner Production 228 | 2020-01-28 |
2018 |
JY Shih, H Hemida, E Stewart, C Roberts Understanding the impact of train run-throughs on railway switches using finite element analysis published pages: 95440971879575, ISSN: 0954-4097, DOI: 10.1177/0954409718795759 |
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit | 2019-09-09 |
2018 |
Sakdirat Kaewunruen, Lei Wu, Keiichi Goto, Yanuar Najih Vulnerability of Structural Concrete to Extreme Climate Variances published pages: 40, ISSN: 2225-1154, DOI: 10.3390/cli6020040 |
Climate 6/2 | 2019-09-09 |
2018 |
Sakdirat Kaewunruen Monitoring of Rail Corrugation Growth on Sharp Curves For Track Maintenance Prioritisation published pages: , ISSN: 1027-5851, DOI: 10.20855/ijav.2018.23.11078 |
The International Journal of Acoustics and Vibration 23/1 | 2019-09-09 |
2017 |
Adam Azzoug, Sakdirat Kaewunruen RideComfort: A Development of Crowdsourcing Smartphones in Measuring Train Ride Quality published pages: , ISSN: 2297-3362, DOI: 10.3389/fbuil.2017.00003 |
Frontiers in Built Environment 3 | 2019-09-09 |
2019 |
Dan Li, Sakdirat Kaewunruen Effect of Extreme Climate on Topology of Railway Prestressed Concrete Sleepers published pages: 17, ISSN: 2225-1154, DOI: 10.3390/cli7010017 |
Climate 7/1 | 2019-09-09 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "S-CODE" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "S-CODE" are provided by the European Opendata Portal: CORDIS opendata.