The page lists 16 deliverables related to the research project "5G-PICTURE".
title and desprition | type | last update |
---|---|---|
Initial Periodic ReportThis deliverable contains the outcomes of the first reporting period. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
5G and Vertical services, use cases and requirementsThis deliverable will provide the definition of the ecosystem that the 5G-PICTURE is aiming to address. The 5G and vertical services, use cases (rail, IoT, Stadium and Mega Event, and Industry 4.0) anrd their requirements that 5G-PICTURE will support will be described in detail and an analysis on how these influence the KPIs of the overall architecture will be given. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
Project Management HandbookOverall administrative and scientific project management, organisation of meetings and events, reporting, budgeting, streamlining of communication, knowledge transfer, progress monitoring, verifiable assessment and reviewing of the project against the deliverables and milestones, consideration of intellectual properties, communication with EU Commission. - Task: 1.1 and 1.2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
System architecture and preliminary evaluationsThis deliverable will provide a functional description of the overall system architecture and a preliminary evaluation in terms of technical feasibility, deployment considerations, and KPI related performance. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
Initial report on Data Plane Programmability and infrastructure componentsThis deliverable will provide the initial with complete specification of the platforms for programmable network functions that will be designed in tasks 3.1, 3.2 and 3.3. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
State of the art and initial function designThis deliverable will provide a state of the art review on the functions to be developed in T4.1, T4.2 and T4.3, as well as an initial design of these functions. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-03-12 |
Specification of Vertical Use cases and Experimentation planSpecification of vertical use cases and scenarios to be demonstrated in Tasks 6.3 and Task 6.4 and the experimentation plan comprising the tests and KPIs to be executed in the testbeds and vertical sites for evaluating the solutions of 5G-PICTURE. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Initial Standardisation Activities documentThis deliverable will provide an initial overview of the project standardisation activities (contributions to relevant standardisation bodies). Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Initial dissemination and communication activities documentThis deliverable will provide an initial overview of the dissemination and communication related activities (presentations at conferences/workshops, publications, press releases, demos at exhibitions, liaison activities to other 5G-PPP projects, etc.) Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Complete design and initial evaluation of developed functionsThis deliverable will provide a complete specification of the functions developed in T4.1, T4.2 and T4.3, as well as an initial evaluation of their performance in the framework of 5G-PICTURE. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Relationships between Orchestrators, Controllers, slicing systemsThis deliverable lists our results on how to design and realize, along with interface definitions, the relationships between orchestrators, controllers, and – potentially external – slicing systems. It contains some first simulation results for scalability. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Vertical services, architecture and final evaluationsThis deliverable will report the refined 5G-PICTURE architecture together with a detailed evaluation of its performance through modelling and simulations focusing on a set of KPIs as well as cost and energy consumption analysis. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Vertical Demo and Testbed setup and initial validation resultsReport on the setup and deployment of the developed components over the testbeds and the two vertical cases sites. Results from initial validation tests will also be included. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Demonstrators, pilots, prototypes | 2020-02-12 |
Auto-adaptive hierarchiesConcepts, interfaces, algorithms how to realize auto-adaptive hierarchies. Quantitative results. Proof-of-concept implementation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Support for multi-version servicesMulti-version handling. Definition of meta-data, characterisation of placement problem.Details on orchestration approach and, in particular, quantitative results. Proof-of-concept implementation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |
Intermediate report on Data Plane Programmability and infrastructure componentsThe D3.2 deliverable will give the detailed architectural description programmable platforms developed in tasks 3.1, 3.2 and 3.3. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-12 |