Opendata, web and dolomites

z-BURN

Zero-Emission Catalytic Burner for heating in Electric and Hybrid Vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 z-BURN project word cloud

Explore the words cloud of the z-BURN project. It provides you a very rough idea of what is the project "z-BURN" about.

either    forecast    63    euro6    heaters    temperatures    100    levels    37    fall    18    cevt    hybrid    profits    successful    lynk    combustion    carbon    power    13    emissions    easily    heating    depleting    popularity    first    benefits    pm    oem    11    cover    units    94    acute    heavy    manufacturing    business    engines    6m    burner    mg    pioneers    yrs    270k    roi    delivers    vehicle    zemission    fuel    500k    hydrocarbon    heat    climates    degrees    plan    reductions    climate    volvo    solutions    global    shown    validated    co    burn    phev       issue    monoxide    60    cabin    nox    ab    validate    8m    centre    auxiliary    90    zero    innovation    waste    32m    delivering    vehicles    market    sales    powered    suitability    92    battery    decrease    emission    efficiency    insufficient    opportunity    draw    audi    evs    cold    offers    forecasts    suffer    oems    geely    regulations    appealing    trials    vs    electric    cabins    78    catalytic    km    operated    internal    brand    trl6    plug    normal    phevs   

Project "z-BURN" data sheet

The following table provides information about the project.

Coordinator
ZEMISSION AB 

Organization address
address: OLE ROMERS VAG 12
city: LUND
postcode: 223 70
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.zemission.se/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2017-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ZEMISSION AB SE (LUND) coordinator 50˙000.00

Map

 Project objective

The increasing popularity of Electric Vehicles (EVs) and Plug-in Hybrid Electric Vehicles (PHEVs) is creating a growing need for auxiliary cabin heaters since the waste heat typically used to heat cabins from Internal Combustion Engines is either not available or insufficient. The need for auxiliary heaters are particularly acute for cold climates - Studies have shown EVs in normal cold climate temperatures (-7 degrees C) suffer a range decrease of up to 60%. However, cabin heating is also a very important issue even in normal temperatures. Increasing sales of EVs and PHEVs are therefore creating a need for either fuel-operated or electric-powered auxiliary heaters. Current fuel-operated heaters are emission heavy and do not fall within current emissions regulations. Electric heaters draw power from the main battery, depleting vehicle range. We are Zemission AB, pioneers of a market leading catalytic combustion burner for heaters: ‘z-BURN’. z-BURN offers a market first, multi-fuel, zero-emission burner delivering up to 92% efficiency vs 78% of current solutions. z-BURN delivers 100% reductions of Hydrocarbon and Carbon Monoxide, 94.5% reduction of PM(0.11 mg/km) and 90% reduction of NOx(4.5 mg/km). These levels go far beyond current Euro6 regulations and will easily achieve future emissions regulations. Successful trials with Volvo and Audi have validated z-BURN at TRL6 and market suitability. Geely (Global Vehicle OEM) is interested in z-BURN for the new Lynk&Co brand PHEVs. With support from Geely’s Innovation Centre CEVT this opportunity will cover 270k units of our overall 500k unit PHEV forecast over 7-yrs. The benefits of Z-BURN are widely appealing to many OEMs for their PHEVs and eventually EVs. This Phase 1 project will help validate the z-BURN business case and fully define our manufacturing scale-up plan. 5-yr forecasts show: sales of €32m & profits of €18.8m, with ROI of 6.3:1. 7-yr forecasts show: sales of €63.8m & profits of €37.6m with ROI of 13.6:1.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "Z-BURN" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "Z-BURN" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

GMP (2017)

Green Marine Propulsion

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More