Opendata, web and dolomites

SPEED-EU

Damping device to solve the pantograph-line capture problems, especially for the EU high-speed railways lines

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SPEED-EU project word cloud

Explore the words cloud of the SPEED-EU project. It provides you a very rough idea of what is the project "SPEED-EU" about.

post    companies    enter    acquisition    considerable    fluids    90    conductors    jobs    solution    iron    contact    allowable    esploitation    fluid    linear    special    power    nor    arcing    workshop    exploits    thanks    demands    joule    1920    kineto    modern    speed    bertolotti    visually    create    mechanically    rail    officina    electrical    difficult    dynamic    substitution    limit    fratelli    carpentry    expensive    thread    transport    goodness    damage    consequent    electricity    trains    replacement    crawling    dispersed    countries    sensitive    interruption    million    traffic    revenues    direct    abandonment    customers    small    started    environment    56    effect    15    railway    blacksmith    innovation    catenary    pantograph    structures    airline    made    electric    war    works    brand    company    continuous    materials    linked    save    founded    construction    infrastructure    specialised    transmission    train    installation    oscillations    1901    temperatures    period    industry    fixed    inspected    becomes    commercialization    stringing    dissipation   

Project "SPEED-EU" data sheet

The following table provides information about the project.

Coordinator
OFFICINA FRATELLI BERTOLOTTI SPA 

Organization address
address: VIA MILANO 4
city: VOLPIANO
postcode: 10088
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website https://www.fratelli-bertolotti.com/ricerca-sviluppo/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-02-01   to  2018-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    OFFICINA FRATELLI BERTOLOTTI SPA IT (VOLPIANO) coordinator 50˙000.00

Map

 Project objective

'Officina Fratelli Bertolotti S.p.A. was founded in 1901 as a small workshop that was working as blacksmith. From 1920 it specialised in special iron carpentry and in the post-war period it becomes a modern industry thanks to the acquisition of customers in the industry 'Electricity transmission'. Today the company brand is linked to that of the most important Electrical and Transport companies in various countries. The proposed innovation was started in order to respond to the emerging needs of the railway sector for the high-speed trains infrastructure. The goodness of the electric power uptake by the thread of the airline has been a problem since the abandonment of the 'third rail', but the increase in speed and power demands made it even more difficult to ensure continuous contact between catenary and crawling, with the consequent formation of electrical arcing which can damage fixed installation, pantograph and electrical systems of the train. The ability to maintain a continuous and fluid contact between these two elements is one of the main factors that limit the allowable speed of trains. The most direct solution, that is the stringing of conductors, involves considerable problems related to the substitution of the infrastructure: high costs and rail traffic interruption. Our innovation exploits the non-linear kineto-dynamic made by the specific construction, it is mechanically simple, does not use materials sensitive to temperatures, nor dissipation by Joule effect, works for small and large oscillations, does not use fluids that may be dispersed in the environment, and can be inspected visually. Furthermore, it is much less expensive than the replacement of the conductors and of support structures, allowing to save 90% of replacement costs. From the esploitation of SPEED-EU we expect to create 15 new jobs, enter into the rail sector and increase revenues of €56 million in a 4-years commercialization period.'

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPEED-EU" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SPEED-EU" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

NANOL4TP (2018)

Decreasing fuel consumption in transport

Read More  

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More