Opendata, web and dolomites

GEODEPOWER

Cutting-edge deep geothermal system and drilling technology suitable for all users and locations

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GEODEPOWER project word cloud

Explore the words cloud of the GEODEPOWER project. It provides you a very rough idea of what is the project "GEODEPOWER" about.

lots    constructed    fracking    hours    supplier    delivering    projected    asker    deep    trl7    airport    arenas    gwh    countries    chp    completion    buildings    location    deliveries    office    environment    oslo    emissions    heat    densely    nordic    operation    return    2017    geodepower    contamination    space    beginning    2007    plan    lack    noise    initially    000m    managed    geoscience    pumps    enhanced    owner    populated    rate    round    2016    150    nov    zero    plants    business    outside    generation    800m    occupying    cooling    energy    drilling    groundwater    runways    2x1500m    installation    demanding    ratio    17    heating    ideal    developer    area    team    founded    temperature    irr    trl6       jobs    sports    rock    internal    industrial    geological    deployment    gradients    residential    venturing    wells    licensees    sidewalks    rig    market    parking    serve    fit    norwegian    patented    combined    profit    loop    sme    joint    power    closed    domestic    small    almost    first    electricity    plant    model    million    geothermal    soil    2023    implies    23    roll    ipp   

Project "GEODEPOWER" data sheet

The following table provides information about the project.

Coordinator
ROCK ENERGY AS 

Organization address
address: LILLEAKERVEIEN 8
city: OSLO
postcode: 283
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website http://www.rockenergy.no/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2018-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ROCK ENERGY AS NO (OSLO) coordinator 50˙000.00

Map

 Project objective

Rock Energy AS is a Norwegian SME founded in 2007 and managed by a highly experienced team within geoscience, rig, drilling, and energy systems. We have developed GEODEPower geothermal plants based on deep-drilling and enhanced geothermal well-system patented technology capable of delivering energy even in very low geothermal gradients, thus allowing exploitation at any location no matter geological activity. GEODEPower wells reach as deep as to 5,000 m, and through a closed loop system achieve high-energy delivery all year round occupying almost no space. Our technology can fit energy deliveries from 0.3 to 150 GWh/year/well with high utilization ratio in terms of operational hours. Thus, we can serve since low-temperature demanding end users such as residential and office buildings, sports arenas, parking lots, and sidewalks to airport runways, and large industrial users through heat pumps and combined heat and power (CHP) plants. GEODEPower closed-loop operation implies no fracking, no contamination of groundwater/soil, and zero emissions. These features together with the lack of operation noise, and the small area for installation, make them the ideal electricity, heating and cooling supplier in densely populated areas. The first GEODEPower plant to demonstrate the technology in a relevant environment constructed in Asker 2016 (down to 800m) is now in testing phase (TRL6). A plant with 2x1500m wells is planned for Oslo Airport, drilling phase beginning in Nov 2017. After project completion at the airport will be at TRL7. We have projected the roll out of our business plan initially through the Nordic countries, our domestic market, through an IPP developer model enabling to the end user to be plant’s owner. Outside the Nordic market, we are focused on the deployment of 5,000m wells by licensees and joint venturing. We expect €23,3 million profit by 2023, with an Internal Return Rate (IRR) of 17.8% for Rock Energy, and the generation of 70 new jobs.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GEODEPOWER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GEODEPOWER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

FlyInGS (2017)

Flywheel energy storage for Increased Grid Stability

Read More  

X-TEC (2018)

A groundbreaking renewable-energy technology for reducing truck emissions

Read More