Explore the words cloud of the SpecEMS project. It provides you a very rough idea of what is the project "SpecEMS" about.
The following table provides information about the project.
Coordinator |
LINCLAB NETWORK SL
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | https://www.linc.tools |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3. (PRIORITY 'Societal challenges) 2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs) 3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies) |
Code Call | H2020-SMEInst-2018-2020-1 |
Funding Scheme | SME-1 |
Starting year | 2019 |
Duration (year-month-day) | from 2019-03-01 to 2019-08-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | LINCLAB NETWORK SL | ES (MADRID) | coordinator | 50˙000.00 |
Linc’s mission is to make effective energy management accessible to all.
Our breakthrough energy management solution uses advanced spectral analysis to monitor energy consumption on an appliance-by-appliance basis. Installed at a single point — without needing sensors across the building — it delivers an energy breakdown accuracy of 95%, and has proven savings of up to 34%.
Our hardware and software is installed within 30 minutes by any electrician, in any type of residential, commercial, or industrial building - new or old. It is the first and only energy management solution to be delivered as a low cost service (€9/month), with NO upfront costs.
It feature built-in controls for building automation and demand response. It is the first energy management system with a fully-integrated microgrid blockchain to trade clean, renewable energy.
Linc answers directly to European challenges of boosting energy efficiency and renewable generation by 27% each by 2030 — as is necessary to prevent the dire consequences of global warming exceeding 1.5C.
The EU is not on schedule. 75% of European buildings remain inefficient, and are being renovated at a rate of 1% per year - it will take 100 years to retrofit them. Meanwhile, investment in renewables has stagnated with government subsidies being phased out, and utilities left with no incentive to purchase irregular renewable supplies that destabilise their grid networks.
Existing Building Energy Management Systems (BEMS) are too costly and complex — suitable only for the most energy-intensive buildings; while smart-meters are not very “smart” after all — saving consumers less than 3%.
Linc solves this. We seek H2020 funding to study the technical and commercial feasibility of our solution. We have support from major piloting partners across all target segments, and project a revenue potential of €24 million with €11 million in net profit within five years of commercialisation, creating of 104 direct jobs.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPECEMS" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "SPECEMS" are provided by the European Opendata Portal: CORDIS opendata.