Explore the words cloud of the Djewels project. It provides you a very rough idea of what is the project "Djewels" about.
The following table provides information about the project.
Coordinator |
NOURYON INDUSTRIAL CHEMICALS B.V.
Organization address contact info |
Coordinator Country | Netherlands [NL] |
Total cost | 43˙929˙750 € |
EC max contribution | 10˙999˙999 € (25%) |
Programme |
1. H2020-EU.3.3.8.3. (Demonstrate on a large scale the feasibility of using hydrogen to support integration of renewable energy sources into the energy systems, including through its use as a competitive energy storage medium for electricity produced from renewable energy sou...) |
Code Call | H2020-JTI-FCH-2018-1 |
Funding Scheme | FCH2-IA |
Starting year | 2020 |
Duration (year-month-day) | from 2020-01-01 to 2025-12-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | NOURYON INDUSTRIAL CHEMICALS B.V. | NL (ARNHEM) | coordinator | 257˙500.00 |
2 | MCPHY ENERGY | FR (La Motte Fanjas) | participant | 9˙889˙999.00 |
3 | INDUSTRIE DE NORA SPA-IDN | IT (MILANO) | participant | 393˙000.00 |
4 | NV NEDERLANDSE GASUNIE | NL (GRONINGEN) | participant | 257˙500.00 |
5 | HINICIO SA | BE (BRUXELLES) | participant | 182˙000.00 |
6 | BIOMETHANOL CHEMIE NEDERLAND B.V. | NL (FARMSUM) | participant | 20˙000.00 |
Djewels demonstrate the operational readiness of 20 MW electrolyser for the production of green fuels (green methanol) in real-life industrial and commercial conditions. It will bring the technology from TRL 7 to TRL 8 and lay the foundation for the next scale-up step, towards 100 MW on the same site. Djewels will enable the development of next generation of pressurised alkaline electrolyser, by developing embarking more cost efficient, better performing, high current density electrodes, preparing the serial manufacturing of the stack and scale-up of the balance of plant components . Economies of scale combines with the flexible and optimized operation of the electrolyser, applying advanced electricity procurement and arbitrage strategies will ensure a low cost of hydrogen for the end-user during the 3 years of operation. This project will demonstrate the conditions for a profitable business cases for green hydrogen production as an input for green (or low-carbon) methanol production towards large-scale deployment in Europe before 2030. Djewels will be located in Delfzijl industrial park, where AkzoNobel already produces hydrogen through a chlor-alkali process and where the (bio)methanol producer, BioMCN, is also located. Delfzijl industrial park has with a direct connection to the electricity transmission grid, and low distribution network charges within. Other hydrogen industry clients in Delfzijl create further conditions for scaling up green hydrogen production. Beyond Delfzijl, the park is connected via a dense gas networks to other large-scale chemical and (petro)chemical hydrogen clients in the Netherlands and Germany. These could allow Djewels to be a stepping stone towards the creation of a new hydrogen valley, in line with the ambitions of the FCH2-JU and the regional roadmap, within the industrial cluster of Delfzijl, the Northern Netherland and beyond.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DJEWELS" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "DJEWELS" are provided by the European Opendata Portal: CORDIS opendata.