Progetti FP7 coordinati da "Ibk-innovation gmbh & co. kg"

# progetto  anno  totale costo  contributi 
1 ETRIOLLA Experimental TRansonic Investigations On Laminar flow and Load Alleviation 2013 4˙232˙359.00 3˙174˙269.00
2 ESICAPIA Experimental Subsonic Investigation of a Complete Aircraft Propulsion system Installation and Architecture power plant optimization 2013 2˙599˙612.00 1˙874˙303.00
3 EULOSAM "Design and Manufacturing of Baseline Low-Speed, Low-Sweep Wind Tunnel Model" 2013 999˙330.00 749˙497.00
4 LOSITA LOw Subsonic Investigationof a largecomplete Turboprop Aircraft 2013 2˙399˙835.00 1˙697˙851.00
5 EASIER Experimental Acoustic Subsonic wind tunnel Investigation of the advanced geared turbofan Regional aircraft integrating HLD innovative low-noise design 2014 749˙931.00 562˙448.00
6 WITTINESS WindTunnel Tests on an Innovative regional A/C for Noise assessment 2014 997˙581.00 748˙186.00

Altri progetti

L'Ente ibk-innovation gmbh & co. kg partecipato anche in questi progetti.