Coordinatore | IBK-INNOVATION GMBH & CO. KG
Organization address
address: REHDORFER STRASSE 4 contact info |
Nazionalità Coordinatore | Germany [DE] |
Totale costo | 2˙399˙835 € |
EC contributo | 1˙697˙851 € |
Programma | FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives |
Code Call | SP1-JTI-CS-2013-01 |
Funding Scheme | JTI-CS |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-10-01 - 2015-09-30 |
# | ||||
---|---|---|---|---|
1 |
IBK-INNOVATION GMBH & CO. KG
Organization address
address: REHDORFER STRASSE 4 contact info |
DE (NUERNBERG) | coordinator | 744˙120.00 |
2 |
REVOIND INDUSTRIALE
Organization address
address: VIA CASALE MARCANGELI 13 contact info |
IT (ORICOLA) | participant | 749˙681.00 |
3 |
RUAG Schweiz AG
Organization address
address: Seetalstrasse 175 contact info |
CH (EMMEN) | participant | 204˙050.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The project tackles the design, manufacturing and testing of an advanced turob-prop 90-seat regional aircraft complete powered model. The model will be tested in a Wind-Tunnel with the aim of evaluation the performance of the high-.lift devices in different configurations. Major work-packages therefore are the design and manufacturing of the model, the design and manufacturing of a engine demonstrator, the integration of all the parts into the model and the final test including a ground-vibration test as well as the Wind-Tunnel test under low-speed conditions. The consoritum set up for this proposal therefore consists of companies specialisied in the three doamins. IBK will coordinate the consortium and perform the design. Revoind Industriale is performing the manufacturing, RUAG as third partner will focus on the engine development. The proposal tackling these different tasks will introduce a number of highly innovative approaches to solve the detailed problems that arise in such a complex task.'