Coordinatore | SANBORN AS
Organization address
address: ZBRASLAVSKA 27 MALA CHUCHLE contact info |
Nazionalità Coordinatore | Czech Republic [CZ] |
Totale costo | 1˙500˙041 € |
EC contributo | 1˙132˙700 € |
Programma | FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs |
Code Call | FP7-SME-2011 |
Funding Scheme | BSG-SME |
Anno di inizio | 2011 |
Periodo (anno-mese-giorno) | 2011-12-01 - 2013-11-30 |
# | ||||
---|---|---|---|---|
1 |
SANBORN AS
Organization address
address: ZBRASLAVSKA 27 MALA CHUCHLE contact info |
CZ (PRAHA) | coordinator | 337˙417.00 |
2 |
AQUASIUM TECHNOLOGY LTD
Organization address
address: PEMBROKE AVENUE 43 DENNY INDUSTRIAL contact info |
UK (CAMBRIDGE) | participant | 353˙965.00 |
3 |
"INETEC-INSTITUT ZA NUKLEARNU TEHNOLOGIJU DRUSTVO S OGRANICENOM ODGOVORNOSCU ZA ISTRAZIVACKO RAZVOJNE I KONSULTING USLUGE, PROIZVODNJU I TRGOVINU"
Organization address
address: DOLENICA 28 LUCKO contact info |
HR (ZAGREB) | participant | 252˙837.00 |
4 |
VESTAS WIND SYSTEMS A/S
Organization address
address: HEDEAGER 44 contact info |
DK (AARHUS) | participant | 64˙617.00 |
5 |
FORJAS IRAETA HEAVY INDUSTRY SL
Organization address
address: MEAGAKO ERREPIDEA 10 contact info |
ES (ZESTOA) | participant | 54˙657.00 |
6 |
TWI LIMITED
Organization address
address: Granta Park, Great Abington contact info |
UK (CAMBRIDGE) | participant | 34˙680.00 |
7 |
LULEA TEKNISKA UNIVERSITET
Organization address
address: University Campus, Porsoen contact info |
SE (LULEA) | participant | 34˙527.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'There is a tendency to higher power offshore wind turbines, leading to larger turbine towers (5m diameter and greater) and a requirement for large diameter connection flanges between the tower sections and between the tower and foundation transition pieces. Currently, forged rings are specified, with inherently high cost and few suppliers worldwide. This leads to long lead times and higher costs for these strategic parts.
RingMan will develop an alternative manufacturing route (using lower-cost cold rolled plate) which will enable the fabrication of large diameter wind tower flanges to be undertaken by our SME consortium members.
The project will enable the partners to commission:
• Development of high quality, low distortion, thick section electron beam welding fabrication and machining to produce flanges from readily available cold rolled steel plate material. • Understanding of the flange property requirements and how these can be met by a fabricated flange leading to design tools to enable wind turbine tower designers to specify these products. • Procedures for inspection that will aim to ensure that the parts manufactured meet or exceed the required performance properties.'
Development of sustainable and cost effective water quality management technology for the aquaculture industry
Read MoreDevelopment of an Efficient Manufacturing of Laser Assisted Colds-Sprayed components for the Automotive Industry
Read MoreENRICHMENT OF AQUACULTURE IMPLANTS BY INTRODUCTION OF NEW MARINE SPECIES FROM THE WILD TO BREEDING
Read More