Coordinatore | STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM
Organization address
address: Anthony Fokkerweg 2 contact info |
Nazionalità Coordinatore | Netherlands [NL] |
Totale costo | 6˙615˙525 € |
EC contributo | 4˙596˙243 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-AAT-2012-RTD-1 |
Funding Scheme | CP-FP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-09-01 - 2016-02-29 |
# | ||||
---|---|---|---|---|
1 |
STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM
Organization address
address: Anthony Fokkerweg 2 contact info |
NL (AMSTERDAM) | coordinator | 657˙750.00 |
2 |
DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV
Organization address
address: Linder Hoehe contact info |
DE (KOELN) | participant | 445˙412.50 |
3 |
UNIVERSITAET STUTTGART
Organization address
address: Keplerstrasse 7 contact info |
DE (STUTTGART) | participant | 406˙070.00 |
4 |
AIRBUS DEFENCE AND SPACE GMBH
Organization address
address: WILLY MESSERSCHMITT STRASSE 1 contact info |
DE (OTTOBRUNN) | participant | 372˙919.50 |
5 |
ZURCHER HOCHSCHULE FUR ANGEWANDTE WISSENSCHAFTEN
Organization address
address: GERTRUDSTRASSE 15 contact info |
CH (WINTERTHUR) | participant | 367˙700.00 |
6 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 338˙448.75 |
7 |
UNIVERSITE CATHOLIQUE DE LOUVAIN
Organization address
address: Place De L'Universite 1 contact info |
BE (LOUVAIN LA NEUVE) | participant | 322˙560.00 |
8 |
UNIVERSITY OF PATRAS
Organization address
address: UNIVERSITY CAMPUS RIO PATRAS contact info |
EL (RIO PATRAS) | participant | 289˙800.00 |
9 |
CENTRE DE RECHERCHE EN AERONAUTIQUE ASBL - CENAERO
Organization address
city: GOSSELIES contact info |
BE (GOSSELIES) | participant | 266˙043.75 |
10 |
VYZKUMNY A ZKUSEBNI LETECKY USTAV A.S.
Organization address
address: Beranovych 130 contact info |
CZ (PRAHA-LETNANY) | participant | 261˙896.50 |
11 |
SHORT BROTHERS PLC
Organization address
address: "Airport Road, Queens Island" contact info |
UK (BELFAST) | participant | 243˙292.50 |
12 |
AIRBUS OPERATIONS GMBH
Organization address
address: Kreetslag 10 contact info |
DE (HAMBURG) | participant | 232˙660.00 |
13 |
SOCIETE ANONYME BELGE DE CONSTRUCTIONS AERONAUTIQUES-S.A.B.C.A.
Organization address
address: Chaussee de Haecht 1470 contact info |
BE (BRUXELLES) | participant | 230˙600.00 |
14 |
"FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE MATERIALES COMPUESTOS"
Organization address
address: Avda Rita Levi Montalcini (Tecnogetafe) 29 contact info |
ES (Getafe) | participant | 161˙089.50 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The main challenge of the BOPACS project is to reduce the weight and costs of primary aerospace structures by developing bolt free adhesive bonded joints that comply with the airworthiness requirements.
Until today thin walled composite primary aerospace structures are joined by using a large number of fasteners. Bolt free joining would considerably contribute to the weight and cost reduction of aerospace structures.
Within BOPACS target applications will be selected that are commonly used in today’s aerospace primary structures and where adhesive bonding might advantageously replace conventional riveting / fastening. Based on these target application bolt free adhesive bonded joining methods will be developed that comply with the EASA airworthiness requirements.
Contrary to projects focusing on the development of non destructive techniques for the inspection of weak bonds, BOPACS proposes arigorous road map to certification by developing Means of Comply based on:
• Thorough research, beyond the state of the art, into the crack growth / disbond extension mechanisms in adhesively bonded joints. • Design, analysis, testing and assessment of different categories of crack stopping design features, i.e. features that are capable of preventingcracks or disbonds from growing above a predefined acceptable size, with a joint still capable of carrying the limit load.
The project results and certification issues will be reviewed on a regular base by EASA representatives through the Airbus certification department.'