O2GEN

Optimization of Oxygen-based CFBC Technology with CO2 capture

 Coordinatore FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS 

 Organization address address: CALLE MARIANO ESQUILLOR GOMEZ 15
city: ZARAGOZA
postcode: 50018

contact info
Titolo: Dr.
Nome: Luis M.
Cognome: Romeo
Telefono: +34 976 761863

 Nazionalità Coordinatore Spain [ES]
 Totale costo 11˙856˙914 €
 EC contributo 6˙604˙702 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2011-2
 Funding Scheme CP
 Anno di inizio 2012
 Periodo (anno-mese-giorno) 2012-10-18   -   2015-10-17

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS

 Organization address address: CALLE MARIANO ESQUILLOR GOMEZ 15
city: ZARAGOZA
postcode: 50018

contact info
Titolo: Dr.
Nome: Luis M.
Cognome: Romeo
Telefono: +34 976 761863

ES (ZARAGOZA) coordinator 0.00
2    Nome Ente NON disponibile

 Organization address address: II AVENIDA DE COMPOSTILLA 2
city: PONFERRADA
postcode: 24400

contact info
Titolo: Ms.
Nome: Sara
Cognome: Fernandez Iglesias
Telefono: +34 987457454

ES (PONFERRADA) participant 0.00
3    CENTRO SVILUPPO MATERIALI SPA

 Organization address address: Via Di Castel Romano 100
city: ROMA
postcode: 128

contact info
Titolo: Dr.
Nome: Gimondo
Cognome: Pietro
Telefono: +39 065055256

IT (ROMA) participant 0.00
4    ENDESA GENERACION SA

 Organization address address: AV DE LA BORBOLLA 5
city: SEVILLA
postcode: 41004

contact info
Titolo: Mr.
Nome: Sanchez-Biezma
Cognome: Andres
Telefono: 34912131145
Fax: 34912130998

ES (SEVILLA) participant 0.00
5    Foster Wheeler Energia Oy

 Organization address address: Metsanneidonkuja
city: Espoo
postcode: 7

contact info
Titolo: Mr.
Nome: Arto
Cognome: Hotta
Telefono: +358 0 10 393 7288
Fax: +358 0 10 393 7689

FI (Espoo) participant 0.00
6    INERCO INGENIERIA, TECNOLOGIA Y CONSULTORIA SA

 Organization address address: CALLE TOMAS ALBA EDISON 2
city: SEVILLA
postcode: 41092

contact info
Titolo: Mr.
Nome: José Luis
Cognome: Bayort Reposo
Telefono: +34 954 468 100
Fax: +34 954 461 329

ES (SEVILLA) participant 0.00
7    L'AIR LIQUIDE S.A

 Organization address address: Quai d'Orsay 75
city: PARIS 07
postcode: 75007

contact info
Titolo: Mr.
Nome: Vincent
Cognome: Kowalczyk
Telefono: +33 1 39 07 62 84
Fax: +33 1 39 56 11 22

FR (PARIS 07) participant 0.00
8    LAPPEENRANNAN TEKNILLINEN YLIOPISTO

 Organization address address: Skinnarilankatu 34
city: LAPPEENRANTA
postcode: 53850

contact info
Titolo: Prof.
Nome: Timo
Cognome: Hyppänen
Telefono: +358 40 580 3180
Fax: +358 5 621 6399

FI (LAPPEENRANTA) participant 0.00
9    POLITECHNIKA SLASKA

 Organization address address: Ul. Akademicka 2A
city: GLIWICE
postcode: 44-100

contact info
Titolo: Ms.
Nome: Katarzyna
Cognome: Markiewicz – ?liwa
Telefono: +48 32 237 19 98
Fax: +48 32 237 24 50

PL (GLIWICE) participant 0.00
10    TEKNOLOGIAN TUTKIMUSKESKUS VTT

 Organization address address: TEKNIIKANTIE 4 A
city: ESPOO
postcode: 02044 VTT

contact info
Titolo: Dr.
Nome: Antti
Cognome: Tourunen
Telefono: +358 20 722 2718

FI (ESPOO) participant 0.00
11    UNIVERSIDAD DE SEVILLA

 Organization address address: CALLE S. FERNANDO 4
city: SEVILLA
postcode: 41004

contact info
Titolo: Ms.
Nome: Margarita
Cognome: Martinez-Pais Loscertales
Telefono: +34 954488129
Fax: +34 95448117

ES (SEVILLA) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

additional    power    oxygen    ccs    concentrations    efficiency    energy    combustion    oxyfuel    demonstration    flexibility    gas    boiler    flue    recirculation    performance    penalty   

 Obiettivo del progetto (Objective)

The project objective is to demonstrate the concept of the second generation oxyfuel combustion that reduce significantly (50%) the overall efficiency penalty of CO2 capture into power plants, from approximately 12 to 6 efficiency points.

One of the main drawbacks of CCS is the additional energy used for operation. This energetic penalty reduces the power plant efficiency, and increases the cost of electricity and the use of resources (mainly fossil fuels but also water, raw materials and additional equipment). The reduction of the parasitic losses associated with CCS is a major challenge in the next years.

The concept focuses on one of the most important recommendations of the ZEP´s report for the deployment of CCS in the European Union (EU): the use of higher O2 concentrations in oxyfuel combustion reducing the flue gas recirculation and energy penalty.

The use of higher oxygen concentration has important advantages: lower boiler size (CAPEX and OPEX cost), improved possibilities to take advantage of high temperature energy and process integration, the reduction of flue gas recirculation and improved system flexibility.

However to achieve this objective is necessary to demonstrate and analyze the effect of high oxygen concentrations in combustion performance, fuel flexibility, controllability of solid looping within the boiler, material performance, the effects on carbon procession unit and, depending on the results obtained in the demonstration tests, how to use-integrate-optimize the energy/heat from different parts of the process to obtain a reduction of the overall penalty caused by CCS. The project is going to deals with this challenge.

The project technical leaders are Foster Wheeler Energia Oy and Air Liquide, the demonstration facility is CIUDEN and the utility is Endesa Generación.

Altri progetti dello stesso programma (FP7-ENERGY)

STAGE-STE (2014)

Scientific and Technological Alliance for Guaranteeing the European Excellence in Concentrating Solar Thermal Energy

Read More  

EERA-DTOC (2012)

EERA Design Tools for Offshore Wind Farm Cluster

Read More  

SOLHYDROMICS (2009)

Nanodesigned electrochemical converter of solar energy into hydrogen hosting natural enzymes or their mimics

Read More