Coordinatore | GONVARRI MS CORPORATE SL
Organization address
address: CALLE SAN VICENTE 8 EDIFICIO ALBIA contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 6˙345˙378 € |
EC contributo | 3˙936˙563 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2012-1-2STAGE |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-06-01 - 2016-05-31 |
# | ||||
---|---|---|---|---|
1 |
GONVARRI MS CORPORATE SL
Organization address
address: CALLE SAN VICENTE 8 EDIFICIO ALBIA contact info |
ES (BILBAO) | coordinator | 1˙283˙755.00 |
2 |
ALENER SOLAR SL
Organization address
address: CARRETERA DE LA ESCLUSA 11 contact info |
ES (SEVILLA) | participant | 457˙080.00 |
3 |
LOGICA - SOCIEDADE GESTORA DO PARQUE TECNOLOGICO DE MOURA EM SA
Organization address
address: "PARQUE TECNOLOGICO DE MOURA, APARTADO 87" contact info |
PT (MOURA) | participant | 375˙926.00 |
4 |
CLEANERGY AB
Organization address
address: THERES SVENSSONS GATA 15 contact info |
SE (GOTEBORG) | participant | 284˙200.00 |
5 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 283˙375.50 |
6 |
FUNDACION CENTRO TECNOLOGICO AVANZADO DE ENERGIAS RENOVABLES DE ANDALUCIA
Organization address
address: CALLE PARAJE LOS RETAMARES SN contact info |
ES (TABERNAS ALMERIA) | participant | 204˙633.60 |
7 |
TTY-SAATIO
Organization address
address: Korkeakoulunkatu 10 contact info |
FI (TAMPERE) | participant | 197˙578.00 |
8 |
UNIVERSIDAD DE SEVILLA
Organization address
address: CALLE S. FERNANDO 4 contact info |
ES (SEVILLA) | participant | 162˙348.00 |
9 |
AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS
Organization address
address: CALLE SERRANO 117 contact info |
ES (MADRID) | participant | 144˙212.50 |
10 |
MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER WISSENSCHAFTEN E.V.
Organization address
address: Hofgartenstrasse 8 contact info |
DE (MUENCHEN) | participant | 141˙875.00 |
11 |
MACHTTECHNIK AG
Organization address
address: FAHRENHEITSTRASSE 1 contact info |
DE (BREMEN) | participant | 109˙116.00 |
12 |
INSTITUTO DE TELECOMUNICACOES
Organization address
address: AVENIDA DE ROVISCO PAIS 1 contact info |
PT (LISBOA) | participant | 101˙271.00 |
13 |
"STICHTING ASTRON, NETHERLANDS INSTITUTE FOR RADIO ASTRONOMY"
Organization address
address: Oude Hoogeveensedijk 4 contact info |
NL (DWINGELOO) | participant | 90˙748.50 |
14 |
TOUGHTROUGH GMBH
Organization address
address: FAHRENHEITSTRASSE 1 contact info |
DE (BREMEN) | participant | 89˙222.70 |
15 |
JYVASKYLAN YLIOPISTO
Organization address
address: SEMINAARINKATU 15 contact info |
FI (JYVASKYLA) | participant | 11˙221.20 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'In the context of the Energy SET-Plan of the European Commission relevant research and developments channelled to increase the percentage of renewable energy sources. It is crucial the collaboration of the Industry, SME’s and research institutions to bring together the step forward to finally integrate renewable energies as the main source of electricity.
Renewable energies represent a wide field upon which international research needs to be focused. The necessity has been envisaged by the BIOSTIRLING consortium and it has been supported by the synergies found with the large-scale international project SKA. The SKA antennas and reception centres, constitute a continental scale sensor network. Aligned with the trend of renewable resources, the overall objective of the project is to implement a cost effective and efficient new generation of solar dish-Stirling plant based on hybridization and efficient storage at the industrial scale.
In order to achieve successfully the ambitious objective, the collaboration performed by the consortium will take the advantage of the expertise of the members in the developing of a Solar Dish/Stirling system, which besides being more operative in terms of construction, transportation and commissioning, it will be more efficient than actual systems because an innovative storage device and a bio-hybrid energy collector will be developed to guarantee the electricity supply independently on time and weather conditions. Increased modularity of the system will enable the Solar Dish/Stirling system to act as an energy supplier not only to the grid but also in specific uses as supplying energy to the SKA project, which sets the most challenging power requirements of any Large Research Facility.'