Coordinatore | ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 7˙728˙961 € |
EC contributo | 5˙099˙973 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2013-NMP-ENV-EeB |
Funding Scheme | CP-IP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-10-01 - 2017-09-30 |
# | ||||
---|---|---|---|---|
1 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
ES (ALCOBENDAS) | coordinator | 729˙210.00 |
2 |
Nome Ente NON disponibile
Organization address
address: Panuntie 11 contact info |
FI (Helsinki) | participant | 530˙057.00 |
3 |
UNIVERSIDAD DE GRANADA
Organization address
address: CUESTA DEL HOSPICIO SN contact info |
ES (GRANADA) | participant | 521˙090.00 |
4 |
"UNITED TECHNOLOGIES RESEARCH CENTRE IRELAND, LIMITED"
Organization address
address: "FOURTH FLOOR, PENROSE BUSINESS CENTER, PENROSE WHARF, PENROSE QUAY" contact info |
IE (CORK) | participant | 518˙256.00 |
5 |
INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
UK (GLASGOW) | participant | 455˙050.00 |
6 |
CENTRE SCIENTIFIQUE ET TECHNIQUE DU BATIMENT
Organization address
address: Avenue Jean Jaures 84 contact info |
FR (CHAMPS SUR MARNE) | participant | 451˙686.00 |
7 |
Nome Ente NON disponibile
Organization address
city: Nancy contact info |
FR (Nancy) | participant | 380˙050.00 |
8 |
CORK INSTITUTE OF TECHNOLOGY
Organization address
address: ROSSA AVENUE BISHOPSTOWN contact info |
IE (CORK) | participant | 357˙920.00 |
9 |
STAM SRL
Organization address
address: Via Venti Settembre 18/5 contact info |
IT (Genova) | participant | 290˙240.00 |
10 |
FUNDACION CIRCE CENTRO DE INVESTIGACION DE RECURSOS Y CONSUMOS ENERGETICOS
Organization address
address: CALLE MARIANO ESQUILLOR GOMEZ 15 contact info |
ES (ZARAGOZA) | participant | 286˙680.00 |
11 |
"ANA - AEROPORTOS DE PORTUGAL, SA"
Organization address
address: "RUA D - EDIFICIO 120, AEROPORTO DE LISBOA" contact info |
PT (LISBOA) | participant | 204˙840.00 |
12 |
INSTITUTUL DE CERCETARI ELECTROTEHNICE
Organization address
address: SPLAIUL UNIRII 313 SECTOR 3 contact info |
RO (BUCURESTI) | participant | 198˙170.00 |
13 |
Nome Ente NON disponibile
Organization address
address: Ps. Garcia Faria 29 contact info |
ES (Barcelona) | participant | 176˙724.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Buildings Operational stage represents 80% of building’s life-cycle cost of which 50% is consequence of the energy use. Up to 90% of the buildings’ life cycle carbon emissions occur during their operational phase, mainly as consequence of the HVAC, lighting and appliances’ energy use. Therefore, energy and cost saving strategies addressing this building operation phase will have a major impact in the building life cycle cost. Energy IN TIME (EiT) project goes beyond existing building control techniques, developing an integrated control & operation approach, that will combine state of the art modelling techniques with the development of an innovative simulation-based control technique with the overarching objective of automating the generation of optimal operational plans tailored to the actual building and users requirements. This approach will allow reducing system inefficiencies and contributing to improve building energy efficiency and comfort.
The target for Energy IN TIME solution will be existing non-residential buildings, which present the building typologies that guaranties higher impact and room for improvement due to the variety and quantity of facilities and equipment covered and the operational management model used in them. A control tool will be implemented in the building energy management systems to be automatically and remotely operated. The methodology for the enhancing solution implementation will be defined for existing buildings and for its implementation in new buildings since its initial commissioning. The Energy IN TIME project work plan is divided into nine work packages: WP1: Requirements & System Architecture; WP2: Simulation Reference Model; WP3: Whole building Intelligent Control System.; WP4: Diagnosis & Continuous Commissioning; WP5: Energy Decision Support Tool. ; WP6: System Integration & Pilot-Scale Validation.; WP7: Demonstration to implement the designed and developed systems; WP8: Dissemination & exploitation; WP9 Coordination.'
"DEVELOPMENT OF INJECTION AND BLOW EXTRUSION MOLDED BIODEGRADABLE AND MULTIFUNCTIONAL PACKAGES BY NANOTECHNOLOGY: IMPROVEMENT OF STRUCTURAL AND BARRIER PROPERTIES, SMART FEATURES AND SUSTAINABILITY"
Read MoreAngiogenesis-inducing Bioactive and Bioresponsive Scaffolds in Tissue Enginering
Read More